My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-013
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 10:30:05 AM
Creation date
10/1/2015 4:59:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/15/2013
Control Number
2013-013
Agenda Item Number
15.B.1
Entity Name
CDM Smith Inc.
Subject
Engineering Services
Work Order No. 6
SWDD Annual Permitting Services
Supplemental fields
SmeadsoftID
11692
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 2 . 1 - Financial Assurance Report <br /> CDM Smith will prepare documentation that demonstrates proof of financial assurance for the cost <br /> of closing and providing long-term care for the Class I Landfill, the C&D Debris Landfill, and the <br /> Waste Tire Processing Center. This documentation will be submitted for review by the SWDD and <br /> IRC Finance Department. Two copies of the final document will be provided to SWDD. CDM Smith <br /> will meet with SWDD up to four times to discuss issues and to provide needed coordination. CDM <br /> Smith will also respond to FDEP correspondence regarding financial assurance. <br /> Subtask 2 .2 - Survey and Airspace Assessment <br /> CDM Smith will provide surveys and assessments of consumed airspace, performed by Masteller, <br /> Moler, Reed & Taylor, Inc. for the Class I and C &D Landfills. The survey work for the Class I waste <br /> area wi11 include a complete topographic survey of Segments I and II as well as the ditches and <br /> roadways surrounding the Class I area. The topographic survey of the C &D Landfill site will include <br /> the waste area, as well as the fence-line and the surrounding ditches and berms adjacent to the C&D <br /> site. CDM Smith will review the volumetric modeling and include a summary of estimated waste <br /> density based on the results of the survey and volumetric modeling. <br /> The deliverable from Masteller, Moler, Reed & Taylor, Inc. will consist of a survey identifying the <br /> dates the field survey was completed. Airspace consumed and remaining airspace based on the <br /> survey and the construction and design criteria shall be specifically identified in the financial <br /> assurance report. The survey shall also include the results of the volumetric calculations for the <br /> Segment II portions of the Class I landfill, as well as the C&D Landfill. Deliverables accompanying <br /> the survey shall include : <br /> A 1 -inch = 50 feet scale contour map for each site with 1400t contour intervals in regular weight <br /> lines, and 5400t contour intervals in bold weight lines. Signed and sealed contour maps will be <br /> provided on 24-inch by 36-inch paper of each landfill site in 1-inch = 200 feet scale. A Compact Disc <br /> (CD) with ASCII file of the survey data in AutoCAD 2004 will also be provided. <br /> For the Class I Landfill (Segment I and II), the financial assurance report shall include an evaluation <br /> of the compaction of the waste and an analysis as to whether Republic Services is meeting its <br /> contractual compaction requirements. CDM Smith will include escrow account balance <br /> recommendations for Fiscal Year 2012- 2013, as well as escrow account budget recommendations <br /> for Fiscal Year 2013 - 2014. <br /> A-2 pioza.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.