My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-189B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-189B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:33:35 AM
Creation date
10/1/2015 4:44:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
10/16/2012
Control Number
2012-189B
Agenda Item Number
12.I.2
Entity Name
Close Consdtruction LLC
Subject
Egret Marsh Stormwater Park Floway
Agreement Addendum No.2
Area
7295 4th Street
Project Number
0435A
Bid Number
2012053
Supplemental fields
SmeadsoftID
11535
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond No. 2�ecsFz�966 <br />(enter bond number) <br />BY THIS BOND, We CLOSE CONSTRUCTION, t_�c , as Principal and <br />Hartford Fire Insurance Company a corporation, as Surety, are bound to <br />Indian River County, herein called Owner, in the sum of $ 1,2B89482.00 <br />for payment of which we bind ourselves, our heirs, personal representatives, <br />successors, and assigns, jointly and severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated bc4�b, ZoIL, between Principal and Owner for <br />construction of Modifications to Egret Marsh Stormwater Park Floway the contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in <br />the contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or <br />indirectly by Principal in the prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under <br />the contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 455.05 2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />Close Construction, LLC <br />(Na�mep of Principal} <br />By "00000 <br />Tvo�evo►s . C\05Q t Rc25iCCtC� <br />Charles J. Nie son, Rttorney In Fact. <br />Last Revised: 7-25-2011 00605-3 EGRET MARSH FLOWAY <br />F:\Public VJorkslKeithM\Stormwater Projects\Egret Marsh Operation\Concrete Surface Modification\Bidding and Contract Documents\00605 - <br />Public Construction Bond.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.