Laserfiche WebLink
` a. Ninety percent (90%) of Work completed (with the balance being retainage). <br />There viii be no payment for the cost of materials and equipment not incorporated <br />in the Work but stored on the Project site. <br />6.03 Final Payment <br />A. Upon fine! completion and acceptance of the Work in accordance with paragraph 14.07 of <br />the General Conditions (and Supplementary Conditions if applicable), OWNER shall pay <br />the remainder of the Contract Price as recommended by ENGINEER as provided in said <br />paragraph 14.07. <br />ARTICLE 7 -INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions (and Supplementary <br />Conditions if applicable} to the Construction Contract. <br />ARTICLE 13 -CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />.B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurface structures at or contiguous to the Site <br />(except Underground Facilities) which have been identified as provided in paragraph 4.02 <br />of the General Conditions and (2) reports and drawings of a Hazardous Environmental <br />Condition, if any, at the Site which have been identified as provided in paragraph 4.06 of <br />the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all examinations, investigations, explorations, tests, studies, and data concerning <br />conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect Dost, progress, or performance of the Work or which relate to any aspect <br />of the means, methods, techniques, sequences, and procedures of construction to be <br />employed by CONTRACTOR, including applying the speck means, methods, <br />techniques, sequences, and procedures of construction, if any, expressly required by the <br />Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />�� � - - �.. <br />�,� ;. _ <br />... �� <br />vua[u - rtyrwsmesrn �rutnw rvin na/ • rwvu.vvm <br />ADDENDUM N0.2 00520 - 4 <br />F:1Public WakeV(eiNM1&ammveler ProjeUetEBret Marefi CAeretion\Concrete Su�faee ModNitatbNBiOdrp Dodmenls�Bidding eiW Conlrad Dowmerxs100520 -Agreement � G O <br />(Publk Works) -ADDENDUM 2.doc Rev. OSi01 V <br />