Laserfiche WebLink
I <br /> CHANGE ORDER We I <br /> DATE OF ISSUANCE : <br /> EFFECTIVE DATE : <br /> OWNER : INDIAN RIVER COUNTY <br /> CONTRACTOR : CLOSE CONSTRUCTION, LLC <br /> PROJECT : Modifications to the Egret Marsh Stormwater Park Floway <br /> OWNER 'S PROJECT NUMBER : 0435A <br /> ENGINEER : INDIAN RIVER COUNTY <br /> You are directed to make the following changes in the Contract Documents : <br /> Increase or <br /> Item Description Decrease in Increase/Decrease in <br /> Contract Price Contract Time <br /> (Calendar Days) <br /> C01- 1 Delete vapor barrier, tape, and labor per Attachment No . 1 ($3,089 .00) 0.0 <br /> Excavate 2 " of existing floway base material instead of 6" per Attachment No . 1 . (The finish' <br /> C01=2 <br /> elevation of the concrete floway surface was raised four inches to decrease the amount of <br /> excavation required to accommodate the concrete thickness . This resulted in less wear and <br /> tear on facility access roadways, reducing by two-thirds the volume of excavated material <br /> transported to the stockpile area . ) ($ 3, 268.00) 0.0 <br /> Delete mixing existing material in-place per Attachment No . 1 . (This item was not necessary <br /> C01-3 due to the good compaction characteristics of the institu soil . ) ( $ 31250.00) 0 .0 <br /> Items C01-4a through C014e : Concrete Floway, Design Enhancements, Repairs, and <br /> C014 Improvements to Egret Marsh Stormwater Park per Attachment No. 2 $ 7, 754 . 59 0 .0 <br /> Ilk <br /> ni <br /> Q <br /> Q <br /> W <br />