My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-066
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:04:32 AM
Creation date
10/1/2015 5:13:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/02/2013
Control Number
2013-066
Agenda Item Number
8.E.
Entity Name
Close Construction
Subject
Modifications to Egret Marsh Stormwater Park Floway
Area
Egret Marsh Stormwater Park
Project Number
0435A
Supplemental fields
SmeadsoftID
11843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ctr�2 4 aF 4' <br /> 4 <br /> 104=U2 <br /> $'5,208.76 <br /> 10% Overread $520. 88 <br /> &jb4otal $5,729,iO4 <br /> 596 Profit 5286.48 <br /> Total $5,01812 <br /> Sub-Contmetor Representative <br /> Contractors Representative <br /> Descrintion .of-chartme <br /> exist,-associated with added work :per email, r+eques# <br /> 1 ., 22' long x 3' wide x 6g .thnick slab wfth 11 " talc curt 1 #5 c onfiriuous <br /> 2, (2) V 'long x- 17" m 6" Curbs with dowels <br /> 3. 1'€D0 lineal foot of type D Curb <br /> 4. 4W x6' x 6 Slab ;added <br /> Sub=contractor reserves the right to time under the terms and conditione of the contract: <br /> If Contra+ptor executed change order Is not received at the time work is performed. <br /> Sub4o (tractor will be psrforming the work under pratemt peucontract .provlsio»s. <br /> Sueb.Contmbtor`WlH invoice change order work the following month the work is performed <br /> by slgniag dally tictcete Contractor agrees to fund change order work within 30 days <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.