My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-066
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:04:32 AM
Creation date
10/1/2015 5:13:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/02/2013
Control Number
2013-066
Agenda Item Number
8.E.
Entity Name
Close Construction
Subject
Modifications to Egret Marsh Stormwater Park Floway
Area
Egret Marsh Stormwater Park
Project Number
0435A
Supplemental fields
SmeadsoftID
11843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 cbF Z <br /> Egret Marsh Stormwater Park Ftoway 4aelA &/lel + 0 3 <br /> lhcrim River County, Flodde September 15, 2012 <br /> Pmposat Nos 12- 1864. 00 Page 2 of 5 <br /> 1 .3 Cast-in-Place Concrete <br /> GFA will provide an ACI-certified technician to test the concrete delivered to the site. In accordance <br /> With the project specifications, the technician will mold a set of five compression cylinders per <br /> ASTM C-31 for every 50 cubic yards or fraction thereof placed per day. GFA will also determine the <br /> slump and temperature of the concrete each time a set of cylinders are cast <br /> The cylinders will be cured in the laboratory, with one cylinder tested at seven days and three at 28 <br /> days. GFA can also assist in evaluating mix submittals and provide laboratory verifications, 9 <br /> necessary, although fees for this service are not included herein. <br /> 1 ,5 Schedule of Fees <br /> The actual cost of our services will be highly dependent on the construction schedule. As we have <br /> not been provided with a precise construction schedule, it is not possible to make a precise estimate <br /> of the manpower and testing requirements, Therefore, GFA proposes to provide its services on a unit <br /> cost basis, based on the actual work performed and the unit fees shown on the attached Schedule of <br /> Fees. For your budget purposes, GFA has estimated quantities for these services based upon the <br /> anticipated scope of work. <br /> Description Hate Est. Estimates <br /> otys Total <br /> pavement Areal Soils <br /> Sub rade Vensitym Pavement $20.00 Each 60 $1 200.00 <br /> Stabilized Sub rade $20000 Each 80 $1 600.00 <br /> '0 tach <br /> r <br /> Totals $4` 560:00 <br /> Proctors <br /> Soil Proctor I $75.00 Eaccd 4 $300200 <br /> Soil Classification $80.00 Each 4 . .00 <br /> Totalt $620.00 <br /> Concrete TeWng <br /> Test Cylinders In Building $75:00 Set 50 $3,750.00 . <br /> Air Content $15.00 Set 50 $750.00 <br /> Unit We" ' t $254001, Set 50 $1 i2MOO <br /> Total: $3 75x00 <br /> Techinclan Time $45.00 Hour 60 , $2,700.00 <br /> Engineering Review of Test Results <br /> Review , of Test Results by Professional Engineer .. $125:00 Hour1 6 $750:00 <br /> Total• $7, 50.00 <br /> Estimated Construction Materials Testing Budget: $149380.00 <br /> A rate of $45 per hour will apply when fullAlme monitoring of backfill is required. The hourly <br /> rate also applies to stand-by time in excess of 15 minutes. The unit rates and/or hourly rates <br />
The URL can be used to link to this page
Your browser does not support the video tag.