Laserfiche WebLink
Change Order Number 3: Sheet Pile Install/Removal <br />COSTELLO BROTHERS MARINE CONSTUCTION INC <br />1000 PRODUCTION DRIVE <br />SEBRING, FLORIDA 33871. <br />863-382-1352 - Office <br />863-382-8693 - Fax <br />co. teffanaa: in'a-e titlidret wailso <br />QUOTE <br />March 27, 2014 <br />Mr. Chris Rossi <br />Close Construction. <br />RE: PC South 27th Ave. <br />CBMC will drive 210 linear wall ft with 2 corners and build a <br />U shaped coffer dam <br />CBMC will supply labor, hammer and welding equipment <br />Sheeting, beams and crane shall be supplied by OTHER <br />Installation: $ 75,550.00 <br />Extraction: $ 20,000.00 <br />TOTAL COST: $ 95,550.00 <br />Andy E Costello - President <br />