My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-065A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:43:09 AM
Creation date
10/1/2015 6:06:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/13/2014
Control Number
2014-065A
Agenda Item Number
8.I.
Entity Name
Close Construction LLC
Subject
Osprey Marsh
PC South Algal Nutrient Removal Facility
Project Number
949
Supplemental fields
SmeadsoftID
13212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Number 3: Existing Rented Sheets. In addition to the rental charges incurred, there is a typical amount of damaged sheets <br />which require payment of liquidation charges. Based on the tonnage for both existing and additional rented sheets, we estimate this to be <br />approximately 3.14% of the total rented sheets The liquidation charges have been included in the rental amounts. <br />slorlines#eel i <br />a r J c a n company <br />7380 Sand Lake Road Suite 135 <br />Orlando, FL 32819 <br />(407) 622 6001 <br />(407)622 6002 <br />david crawford@skylinesteel.com <br />Approx <br />Q114050tY <br />Rental Quotation <br />!Date : 20 -Sep <br />1 <br />Quote valid for 30 days <br />Customer : Close Construction <br />Attn : Chris Rossi <br />Project . PC South <br />FOB: Vero Beach, FL <br />Terms: net 30 <br />65.61 tons <br />3ea <br />PZ -27 Rental piles - 34 pair 40-50' + <br />4ea 90* Corners <br />return freight to Skyline Rental Yard <br />$145 00/nt 1st month <br />$25.00/nt Sub Months <br />$975.00/load <br />Additional RATES <br />LIQUIDATION (see terms below for applicable liquidation charges) $1400/NT <br />Cleaning upon return to yard (if contractor elects not to clean) $20.00/NT <br />AP m!. TP <br />$9,513 <br />$2,925 <br />Additional Information <br />kist month pricing includes freight to the job site. <br />Invoices will be based on actual weight shipped. <br />Delivey is from current Skyline stock. Skyline Steel is not responsible for delivery delays due to <br />availability of trucks or incliment weather. Customer to give 24hr notice prior to returning material. <br />Skyline Steel uses PZ -27 for rental purposes. Liquidation subject to inspection by a <br />Skyline representative. Liquidation is subject to 17 minimum net usable lengths. <br />Any damaged or unusable lengths will be trimmed. and subject to liquidation rate. <br />Reconditioning charges may apply. Material is quoted from stock subject to prior sale. <br />This quote has been prepared by David Crawford <br />Customer to sign and return showing acceptance of terms and coniditions herein expr <br />Accepted BY: Title: <br />Firm: PO#: <br />
The URL can be used to link to this page
Your browser does not support the video tag.