My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-109
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 2:19:13 PM
Creation date
10/1/2015 5:20:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/18/2013
Control Number
2013-109
Agenda Item Number
8.K.
Entity Name
Coastal Planning & Engineering
Subject
Sector 3 Dune Restoration Repair Project Design and Permitting services
Work Order No.2
Post Hurricane Sandy
Area
Sector 3 Beach
Supplemental fields
SmeadsoftID
11956
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
questions included in the permit application, except as noted below, where we will coordinate the response with the <br /> County. <br /> We will coordinate with the County regarding the sovereign submerged lands application portion (questions 9, and 13 <br /> through 17) of the application. However, the County will be responsible for responding to this section including <br /> providing documentation of upland interest, documenting user fees, and developing a list of names of upland <br /> property owners within 500 feet. Item 17 deals with the sovereign submerged land lease, which should not <br /> be <br /> applicable if the project is constructed above mean high water. <br /> We will coordinate with the County to provide written evidence that the project is consistent with the State-approved <br /> Local Comprehensive Plan. <br /> We request that the County provide an electronic copy of the Erosion Control Line for inclusion in the application. <br /> This will be included and referenced appropriately in all drawings. <br /> We will incorporate 'topographic and bathymetric survey based on the physical monitoring being performed <br /> independently by the County (Morgan & Eklund) . We will coordinate with the County's surveyor to fulfill the <br /> requirements for topographic and bathymetric surveys. The surveys will be sufficiently recent to fulfill application <br /> requirements . <br /> We will develop signed and sealed permit sketches based on the 2013 survey and previously permitted template <br /> (which we should already have available through WO# 1) . The sketches will be comprised on both the beach fill area <br /> as well as the offshore borrow area. <br /> While construction plans are considered part of the JCP application, we will request that the FDEP require these as <br /> part of their Notice to Proceed item list. Development of final plans and specifications is included in a different <br /> portion of this scope of work and will require separate authorization. <br /> Aerials collected under W0# 1 will be used to support the permit application. Collection and rectification of aerials is <br /> not included in this scope. <br /> We will develop a draft construction schedule for the County's review for inclusion in the permit application. <br /> We will coordinate with local mines to obtain sufficient geotechnical information to support the JCP application. We <br /> will review and revise the Sediment QA/QC plan developed for the initial project as necessary. Permit skectehs of <br /> the borrow area will be developed and submitted. <br /> We will describe the natural community within the project area based on the environmental monitoring report being <br /> developed by Ecological Associates . We will review and revise the Environmental Monitoring plan developed for the <br /> initial project as necessary. No additional field work is proposed as part of this effort. <br /> We will coordinate with the County and Ecological Associates regarding sea turtle nesting data and any wildlife <br /> surveys conducted on site. This data will be incorporated into the permit application. No additional field work is <br /> proposed as part of this effort. <br /> We anticipate that this project can be covered by the Statewide Programmatic Biological Opinion (SPBO) . We will <br /> coordinate with USFWS regarding any additional information required to apply the Biological Opinion. <br /> Unfortunately, the SPBO does not include consultation on piping plovers. Separate consultation on piping plovers <br /> may be required. <br /> 2481 NW BOCA RATON BOULEVARD , BOCA RATON , FL 33431 j <br /> 561 . 391 . 8102 • FAX 561 . 391 . 9116 • COASTAL PLANNING & ENGINEERING , INC . , A CB & I COMPANY <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.