My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-207
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 1:44:15 PM
Creation date
10/1/2015 5:38:24 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 13 : Plan Formulation and Deliverables <br /> Based on the above tasks ( 1 - 12) , CPE will prepare a Draft Beach Preservation Plan for County staff <br /> review. The Plan will be consistent with FDEP Erosion Control Program guidelines , and maximize <br /> potential for State funding for erosion control projects . The Plan will include sections describing : <br /> 1 ) The locally preferred alternatives consistent with Florida statutes for addressing or <br /> abatement of beach erosion in each sector, <br /> 2) The necessary restoration and maintenance activities over the next ten years , <br /> 3) A 10-year funding strategy , including post storm recovery budget recommendations . <br /> CPE will review the Draft Plan with the County and make appropriate revisions as may be identified by <br /> the County . CPE will meet with the Beach Committee to present the results of the above tasks (as <br /> described in Task 2) . <br /> CPE will incorporate revisions to the Draft Plan as may be identified and directed by the County . CPE <br /> will assist the County staff in presenting the results of the study to the Board of County Commissioners , <br /> Following Board review and appropriate action , CPE will provide three ( 3) hard copies and one <br /> ( 1 ) <br /> electronic copy ( MS Word and PDF) of the Final BPP update . <br /> Timeline <br /> A draft schedule of main work and deliverables is provided in Table 1 . The schedule is based on <br /> a <br /> Notice to Proceed Date in September. However, the schedule is still achievable , barring any <br /> unforeseen circumstances , if this date slides . The critical path item is the summer beach survey and <br /> incorporation of that data into the economic analysis and draft BPP report . <br /> Table 1 . Anticipated Project Schedule <br /> Description Start Date Anticipated Completion <br /> Date <br /> Notice to Proceed Oct- 13 <br /> Update of Beach Conditions Oct- 13 Nov- 13 <br /> Planning Charette Nov- 13 <br /> Delft3D Calibration Oct- 13 Feb- 14 <br /> Delft3D Production Runs Feb- 14 Mar- 14 <br /> Delft3D Draft Report Mar- 14 Apr- 14 <br /> Vulnerability Analysis Nov- 13 Feb- 14 <br /> Storm Damage Reduction Analysis Feb- 14 Max- 14 <br /> Recreational Benefit Analysis Oct- 13 Jun- 14 <br /> Economic Analysis Mar- 14 Jun- 14 <br /> Draft BPP Report Jul.44 <br /> Comment Period Jul- 14 Aug- 14 <br /> Final BPP Report Sep- 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.