My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-228A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-228A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 10:44:33 AM
Creation date
10/1/2015 3:00:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2011
Control Number
2011-228A
Agenda Item Number
12.I.1
Entity Name
Coastal Technology Corporation
Subject
Work Order No. 12 Sector 3 Beach and Dune Restoration
Phase 2b Construction Phase Services
Area
Beach Sector 3
Supplemental fields
SmeadsoftID
10321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Sector 3 Phase 2b — During Construction Phase Services <br /> Scope of Work <br /> Part 2 — Services During Construction <br /> In general, the COUNTY will administer the Construction Contract for Phase 2b; COASTAL TECH <br /> will generally monitor construction progress and spot-check construction to provide assurances that <br /> the work is constructed in reasonable conformity with the Drawings, General Conditions, Technical <br /> Specifications , applicable permits , and the Construction Contract . <br /> Task 2a — Engineering Services : The COUNTY will administer the Construction Contract and <br /> provide all communications to the Contractor relative to the Project. The COUNTY will directly <br /> observe and monitor the Contractor ' s work to determine the progress and quality of the work, identify <br /> discrepancies and report significant discrepancies to the Contractor and COASTAL TECH . The <br /> COUNTY will keep accurate detailed records of the Contractor' s daily operations and of significant <br /> events that affect the work. The COUNTY will provide to COASTAL TECH a written summary of <br /> the Contractor' s progress on a weekly basis for review during Phase 2b . During construction, the <br /> COUNTY will : <br /> ( a) Monitor the Contractor' s work for compliance with the USACE and FDEP permits . <br /> (b) Check that the Contractor maintains Record Drawings — as are required by the General <br /> Conditions of the Contract Documents . <br /> (c) Check the layout of the work by the Contractor . <br /> (d) Monitor the condition of FDEP survey reference monuments and the Contractor ' s care of <br /> these monuments . <br /> (e) Monitor the Contractor' s mobilization and demobilization of men and equipment. <br /> ( f) Monitor the Contractor' s transport of material from the upland mines to the beach fill area. <br /> (g) Monitor the details of the work including final grading and dressing of placed fill . <br /> (h) Monitor the Contractor' s work area and measures to provide for public safety . <br /> (i) Monitor turbidity monitoring and reporting by the Contractor including the Contractor' s <br /> Testing Certificate. Submit the required turbidity reports to FDEP (per FDEP Specific <br /> Condition 47 ) . <br /> (j ) Monitor the Contractor' s compliance with the Sediment QA/QC Plan . <br /> (k) Monitor the Contractor' s work relative to any impacts to any historical , archeological, and <br /> cultural resources . <br /> ( 1) Check the work for substantial compliance and monitor the Contractor ' s final clean - up of the <br /> Project site including the staging areas and trucking routes . <br /> (m) Document and monitor conditions of the areas to be used by the Contractor including truck <br /> routes , staging areas, and the overall Project area before, during, and after construction. <br /> (n) Collect and deliver (< 10) sand samples to COASTAL TECH ' S Vero Beach office. <br /> (o) Perform compaction testing along the Phase 1 , 2 , and 2b Project area (per FDEP Specific <br /> Condition 23 ) <br /> (p) Take representative photographs along each fill acceptance section and compile them in a <br /> document to photo-document that the Contractor tilled the beach following completion of <br /> each fill acceptance section of Phase 2b . <br /> (q) Monitor the Contractor ' s dune planting and submit an as-built (Phase 2b) report within 30 <br /> days of planting completion and a post-Phase 1 and 2 annual post-construction dune <br /> vegetation monitoring report to FDEP (per FDEP Specific Condition 14) . <br /> Page 2 of 4 <br /> August 17 , 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.