My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-063A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-063A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 11:13:16 AM
Creation date
10/1/2015 4:21:39 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recommended and the entire balance found to be due the CONTRACTOR , will be paid to <br /> the CONTRACTOR by the OWNER following County Commission approval of the final <br /> Contract payment . <br /> 5 . 5 Acceptance of Final Payment as Release . The acceptance by the CONTRACTOR of final <br /> payment shall be and shall operate as a release to the OWNER from all claims and all <br /> liability to the CONTRACTOR other than claims in stated amounts as may be specifically <br /> excepted by the CONTRACTOR for all things done or furnished in connection with the <br /> work under this Contract and for every act and neglect of the OWNER and others relating <br /> to or arising out of the work . Any payment , however, final or otherwise, shall not release <br /> the CONTRACTOR or its sureties from any obligations under the Contract Documents or <br /> the Payment and Performance Bonds , <br /> ARTICLE 6 INTEREST <br /> Not Applicable . <br /> ARTICLE 7 CONTRACTOR' S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the following <br /> representations : <br /> 7 . 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents , <br /> work , site , locality , and all local conditions and laws and regulations that in any manner may <br /> affect cost , progress , performance or furnishing of the work. <br /> 7. 2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4 . 02 of the General Conditions , and accepts the <br /> determination set forth in Paragraph SC 4 . 02 of the Supplementary Conditions of the extent <br /> of the technical data contained in such reports and drawings upon which CONTRACTOR is <br /> entitled to rely . <br /> 7 . 3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br /> and carefully studying ) all such examinations , investigations , explorations , tests , reports and <br /> studies (in addition to or to supplement those referred to in Paragraph 7 . 2 above) which <br /> pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br /> affect the cost , progress , performance or furnishing of the work as CONTRACTOR considers <br /> necessary for the performance of furnishing of the work at the Contract Price , within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents , including specifically the provisions of Paragraph 4 . 02 of the General Conditions : <br /> and no additional examinations , investigations , explorations , tests , reports , studies or similar <br /> information or data are or will be required by CONTRACTOR for such purposes . <br /> 7 . 4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br /> the Contract Documents with respect to existing underground facilities at or contiguous to the <br /> site and assumes responsibility for the accurate location of said underground facilities . No <br /> additional examinations , investigations , explorations , tests , reports , studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price , within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents , including specifically the provisions of Paragraph 4 . 04 of the General Conditions . <br /> 00530-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.