Laserfiche WebLink
10 . Furnish material for general/structural fill that meets the Technical Specifications , <br /> placement and compaction to the subgrade grades shown on the Construction Drawings ; <br /> 11 . Removal of the final cover geocomposite drainage layer to expose the final cover <br /> geomembrane on Segment 2 east slopes ; <br /> 12 . Cleaning of the Segment 2 final cover geomembrane or liner system geomembrane for tie- <br /> in (extrusion welding or double-track fusion welding as appropriate) to the Cell 1 — <br /> Segment 3 Expansion geomembrane liners ; <br /> 13 . Proofrolling of compacted fill or prepared subgrade surface prior to placement of the liner <br /> subbase ; <br /> 14 . Construction of Cell 1 — Segment 3 Expansion double liner system , including anchor trench <br /> and temporary intercell berm/rain flap ; <br /> 15 . Construction of leachate detection , leachate collection , and leachate transfer systems for <br /> Cell 1 — Segment 3 Expansion ; <br /> 16 . Construction of erosion and sediment control structures ( including silt check dams , straw <br /> bale barriers in perimeter ditches , and silt fence) as necessary to facilitate construction and <br /> minimize erosion during storm events ; and <br /> 17 . Clearing , grubbing , excavation , backfilling , compaction , grading , and proofrolling <br /> necessary to facilitate construction of previously mentioned components of Phase <br /> 2 of Cell 1 — Segment 3 Expansion project . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Geosyntec Consultants , Inc. , hereinafter called ENGINEER , and <br /> who is to act as OWNER' S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents , <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a) Within 30 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior to <br /> construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 61 Mobilize all labor, equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> 00530-2 <br />