G . become aware of the general nature of the work to be performed by OWNER and others <br /> at the Site that relates to the Work as indicated in the Bidding Documents ; <br /> H . correlate the information known to Bidder, information and observations obtained from <br /> visits to the Site , reports and drawings identified in the Bidding Documents , and all additional <br /> examinations , investigations , explorations , tests , studies , and data with the Bidding Documents ; <br /> I . promptly give ENGINEER written notice of all conflicts , errors , ambiguities, or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work. <br /> 4 . 08 The submission of a Bid will constitute an incontrovertible . representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods , techniques , sequences, and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents , that Bidder has <br /> given ENGINEER written notice of all conflicts , errors, ambiguities , and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work. <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> 5 . 01 THERE WILL BE NO PRE-BID CONFERENCE FOR THIS PROJECT. <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> 6 . 01 The Site is identified in the Bidding Documents . All additional lands and access <br /> thereto required for temporary construction facilities, construction equipment, or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for <br /> by <br /> CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7 . 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to PURCHASING (purchasingi0a).ircpov. com) in writing . Interpretations or clarifications <br /> considered necessary by ENGINEER in response to such questions will be issued by Addenda <br /> mailed or delivered to all parties through the Issuing Office as having received the Bidding <br /> Documents . Questions received less than ten days prior to the date for opening of Bids may not <br /> be answered. Only questions answered by Addenda will be binding . Oral and other <br /> interpretations or clarifications will be without legal effect . <br /> 7 . 02 Addenda may be issued to clarify, correct, or change the Bidding Documents as <br /> deemed advisable by OWNER or ENGINEER . <br /> 00200 - Instructions to Bidders REV 0407.doc <br /> 00200 = 4 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927\Admim\Contract Documents\00200 - Instructions <br /> to <br /> Bidders REV 04-07.doc Rev. 05101 j <br />