My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 .01 and 4.05. Paragraph 4 .02 refers to OWNER's ARTICLE 9 - ENGINEER'S STATUS DURING <br /> identifying and making available to CONTRACTOR CONSTRUCTION <br /> copies of reports of explorations and tests of <br /> subsurface conditions and drawings of physical <br /> conditions in or relating to existing surface or 9 .01 OWNER'S Representative <br /> subsurface structures at or contiguous to the Site that <br /> have been utilized by ENGINEER in preparing the A. ENGINEER will be OWNER's representative <br /> Contract Documents . during the construction period . The duties and <br /> responsibilities and the limitations of authority of <br /> 8 . 06 Insurance ENGINEER as OWNER's representative during <br /> construction are set forth in the Contract Documents <br /> A. OWNER's responsibilities, if any, in respect to and will not be changed without written consent of <br /> purchasing and maintaining liability and property insur- OWNER and ENGINEER. <br /> ance are set forth in Article 5. <br /> 9 .02 Visits to Site <br /> 8 .07 Change Orders <br /> A. ENGINEER will make visits to the Site at <br /> A. OWNER is obligated to execute Change intervals appropriate to the various stages of construc- <br /> Orders as indicated in paragraph 10.03 . tion as ENGINEER deems necessary in order to <br /> observe as an experienced and qualified design <br /> 8 .08 Inspections, Tests, and Approvals professional the progress that has been made and the <br /> quality of the various aspects of CONTRACTOR'S <br /> A. OWNER's responsibility in respect to certain executed Work. Based on information obtained <br /> ::inspections, tests, and approvals is set forth in during such visits and observations, ENGINEER, for <br /> paragraph 13.03 . 8 . the benefit of OWNER, will determine, in general , if <br /> the Work is proceeding in accordance with the Con= <br /> 8009 Limitations on OWNER's Responsibilities tract Documents . ENGINEER will not be required to <br /> make exhaustive or continuous inspections on the Site <br /> A. The OWNER shall not supervise, direct, or to check the quality or quantity of the Work , <br /> have control or authority over, nor be responsible for, ENGINEER's efforts will be directed toward providing <br /> CONTRACTOR's means, methods, techniques, se- for OWNER a greater degree of confidence that the <br /> quences, or procedures of construction , or the safety completed Work will conform generally to the Contract <br /> precautions and programs incident thereto, or for any Documents . On the basis of such visits and <br /> failure of CONTRACTOR to comply with Laws and observations, ENGINEER will keep OWNER informed <br /> Regulations applicable to the performance of the of the progress of the Work and will endeavor to guard <br /> Work. OWNER will not be responsible for OWNER against defective Work. <br /> CONTRACTOR's failure to perform the Work in <br /> accordance with the Contract Documents . B . ENGINEER's visits and observations are <br /> subject to all the limitations on ENGINEER's authority <br /> 8 . 10 Undisclosed Hazardous Environmental and responsibility set forth in paragraph 9 . 10 , and <br /> Condition particularly, but without limitation , during or as a result <br /> of ENGINEER's visits or observations of <br /> A. OWNER's responsibility in respect to an CONTRACTOR's Work ENGINEER will not <br /> undisclosed Hazardous Environmental Condition is supervise, direct, control, or have authority over or be <br /> set forth in paragraph 4 .06 . responsible for CONTRACTOR's means, methods , <br /> techniques, sequences, or procedures of construction , <br /> 8 . 11 Evidence of Financial Arrangements or the safety precautions and programs incident <br /> thereto, or for any failure of CONTRACTOR to comply <br /> A. If and to the extent OWNER has agreed to with Laws and Regulations applicable to the <br /> furnish CONTRACTOR reasonable evidence that performance of the Work. <br /> financial arrangements have been made to satisfy <br /> OWNER's obligations under the Contract Documents , 9 .03 Project Representative <br /> OWNER's responsibility in respect thereof will be as <br /> set forth in the Supplementary Conditions . A. If OWNER and ENGINEER agree, ENGI- <br /> NEER will furnish a Resident Project Representative <br /> to assist ENGINEER in providing more extensive <br /> observation of the Work. The responsibilities and <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 28 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41st Sl to 53rd St•SEE PROJ 0927Wdmim\Contract Documents\00700 - General Conditions <br />REV 04- <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.