My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employed by any of them or for whose acts any Work and charges against CONTRACTOR for <br /> of them may be liable. Such losses shall delinquent payments . <br /> include settlements made with the written <br /> consent and approval of OWNER. No such 4. Costs due to the negligence of CON- <br /> losses, damages , and expenses shall be TRACTOR, any Subcontractor, or anyone <br /> included in the Cost of the Work for the directly or indirectly employed by any of them or <br /> purpose of determining CONTRACTOR's fee. for whose acts any of them may be liable, <br /> including but not limited to, the correction of <br /> g. The cost of utilities , fuel , and sanitary defective Work, disposal of materials or <br /> facilities at the Site . equipment wrongly supplied , and making good <br /> any damage to property. <br /> h . Minor expenses such as telegrams, <br /> long distance telephone calls, telephone service 5. Other overhead or general expense <br /> at the Site, expressage, and similar petty cash costs of any kind and the costs of any item not <br /> items in connection with the Work. specifically and expressly included in <br /> paragraphs 11 .01 .A and 11 .01 . 13 . <br /> i . When the Cost of the Work is used to <br /> determine the value of a Change Order or of a C . CONTRACTOR's Fee: When all the Work is <br /> Claim , the cost of premiums for additional performed on the basis of cost-plus, CONTRACTOR's <br /> Bonds and insurance required because of the fee shall be determined as set forth in the Agreement. <br /> changes in the Work or caused by the event When the value of any Work covered by a Change <br /> giving rise to the Claim . Order or when a Claim for an adjustment in Contract <br /> Price is determined on the basis of Cost of the Work, <br /> j . When all the Work is performed on the CONTRACTOR's fee shall be determined as set forth <br /> basis of cost-plus, the costs of premiums for all in paragraph 12 .01 .C . <br /> Bonds and insurance CONTRACTOR is <br /> required by the Contract Documents to D . Documentation: Whenever the Cost of the <br /> purchase and maintain . Work for any purpose is to be determined pursuant to <br /> paragraphs 11 .01 .A and 11 .01 . 8 , CONTRACTOR will <br /> B . Costs Excluded: The term Cost of the Work establish and maintain records thereof in accordance <br /> shall not include any of the following items : with generally accepted accounting practices and <br /> submit in a form acceptable to ENGINEER an <br /> 1 . Payroll costs and other compensation itemized cost breakdown together with supporting <br /> of CONTRACTOR's officers , executives, princi- data . <br /> pals (of partnerships and sole proprietorships), <br /> general managers , engineers , architects, 11 .02 Cash Allowances <br /> estimators , attorneys , auditors, accountants , <br /> purchasing and contracting agents, expediters, A. It is understood that CONTRACTOR has in- <br /> timekeepers , clerks, and other personnel cluded in the Contract Price all allowances so named <br /> employed by CONTRACTOR, whether at the in the Contract Documents and shall cause the Work <br /> Site or in CONTRACTOR's principal or branch so covered to be performed for such sums as may be <br /> office for general administration of the Work acceptable to OWNER and ENGINEER. <br /> and not specifically included in the agreed upon CONTRACTOR agrees that: <br /> schedule of job classifications referred to in <br /> paragraph 11 .01 .A. 1 or specifically covered by 1 . the allowances include the cost to <br /> paragraph 11 .01 .A.4, all of which are to be CONTRACTOR (less any applicable trade <br /> considered administrative costs covered by the discounts) of materials and equipment required <br /> CONTRACTOR's fee. by the allowances to be delivered at the Site , <br /> and all applicable taxes; and <br /> 2 . Expenses of CONTRACTOR's princi- <br /> pal and branch offices other than 2 . CONTRACTOR's costs for unloading <br /> CONTRACTOR's office at the Site . and handling on the Site, labor, installation <br /> costs , overhead , profit, and other expenses <br /> 3 . Any part of CONTRACTOR's capital contemplated for the allowances have been <br /> expenses , including interest on included in the Contract Price and not in the <br /> CONTRACTOR's capital employed for the allowances , and no demand for additional <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 33 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract Documents\00700 - General Conditions <br /> REV 04- <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.