Laserfiche WebLink
SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC405. <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 . General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 . Referenced Standards , <br /> Be Written/computed dimensions shall govern over scaled dimensions . <br /> SC=4a02 Subsurface and Physical Conditions <br /> SC 4 . 02 Add the following new paragraphs immediately after paragraph GC 4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> D . Reports and drawings itemized in SC4 . 02 . 0 are not included with the Bidding <br /> Documents. Copies may be examined at Indian River County Administration <br /> Building , Public Works, 1801 27"' Street, Vero Beach , FL 32960 during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents . <br /> SC-5. 01 Performance, Payment and Other Bonds <br /> SC-5 . 01 .A. Delete paragraph GG5. 01 . A in its entirety and insert the following paragraphs in its <br /> place: <br /> Within fifteen ( 15) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100% of the Contract Price . <br /> 1 . In lieu of the Public Construction Bond , the CONTRACTOR may furnish <br /> an alternative form of security in the form of cash , money order, certified <br /> check, cashier's check, irrevocable letter of credit or a security as listed in <br /> Part II of F . S . Chapter 625 . Any such alternative form of security shall be <br /> for the same purpose , and be for the same amount and subject to the <br /> same conditions as those applicable to the bond otherwise required . The <br /> determination of the value of an alternative form of security shall be made <br /> by the OWNER . <br /> 2 . Such Bond shall continue in effect for one ( 1 ) year after final acceptance <br /> of the Work by the OWNER . <br /> 3 . The OWNER shall record , the Public Construction Bond with the Public <br /> Record Section of the Indian River County Courthouse located at 2000 <br /> 16th Avenue , Vero Beach , Florida 32960. <br /> 00800-2 <br /> 00800 on Supplementary Conditions 06-09 rev.doc <br /> 00800 2F:\Public Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927WdmimlContract Documents100800 - <br />