Laserfiche WebLink
01340 — Submittal of Shop Drawings <br /> E . All submittals shall bear the stamp of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR . Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR . <br /> F . Assign a number to each submittal starting with No . 1 and thence <br /> numbered consecutively. Identify resubmittals by the original submittal <br /> number followed by the suffix "A" for the first resubmittal , the suffix " B" for <br /> the second resubmittal , etc . <br /> G . Initially submit to ENGINEER a minimum of six (6 ) copies of all submittals <br /> that are on 11 -inch by 174nch or smaller sheets ( no less than 8 1 /2-inch x <br /> 11 -inch ) , and one unfolded sepia and 2 prints made from that sepia for all <br /> submittals on sheets larger than 11 -inch by 17-inch . <br /> H . After ENGINEER completes his review, Shop Drawings will be marked <br /> with one of the following notations . <br /> 1 . Approved <br /> 2 . Approved as Corrected <br /> 3 . Approved as Corrected we Resubmit <br /> 4 . Revise and Resubmit <br /> 5 . Not Approved <br /> I . If a submittal is acceptable , it will be marked "Approved " or "Approved as <br /> Corrected " . Three (3 ) prints or copies of the submittal will be returned to <br /> CONTRACTOR . <br /> J . Upon return of a submittal marked "Approved " or "Approved as <br /> Corrected " , CONTRACTOR may order, ship or fabricate the materials <br /> included on the submittal , provided it is in accordance with the corrections <br /> indicated . <br /> K. If a Shop Drawing marked "Approved as Corrected " has extensive <br /> corrections or corrections affecting other drawings or Work, ENGINEER <br /> may require that CONTRACTOR make the corrections indicated thereon <br /> and resubmit the Shop Drawings for record purposes . Such drawings will <br /> have the notation , "Approved as Corrected as Resubmit . " <br /> L . If a submittal is unacceptable , three (3 ) copies will be returned to <br /> CONTRACTOR with one of the following notations . <br /> 1 . " Revise and Resubmit" <br /> 2 . " Not Approved " <br /> M . Upon return of a submittal marked " Revise and Resubmit" , make the <br /> corrections indicated and repeat the initial approval procedure . The " Not <br /> Approved " notation is used to indicate material or equipment that is not <br /> acceptable . Upon return of a submittal so marked , repeat the initial <br /> approval procedure utilizing acceptable material or equipment . <br /> 01340 - Submittal of Shop Drawings .doc <br /> 01340-5 <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927V1dmimlContract <br /> Documents\01340 - Submittal of Shop Drawings.doc <br />