Laserfiche WebLink
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees , shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk , branches , bark or roots . <br /> B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic . <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet. Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run-off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality. <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1 .4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two (2 ) days . Irrigation systems <br /> partially within the right-of-way of Indian River Boulevard and all intersecting side <br /> streets within project limits may be cut off and capped or connected to same <br /> system to maintain functionality . The CONTRACTOR shall be responsible for <br /> maintaining the functionality of the remaining portion of the system if it should fall <br /> outside of the right-of4ay. <br /> 01541 -2 <br /> F:\PublieWorks\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927\Admim\Contract <br /> Documents\01541 - Protection of Property.doc <br /> f <br />