Laserfiche WebLink
horizontal and vertical control shown on the engineering plans that was destroyed <br /> during construction . <br /> 2 . New roadway alignment control points (Survey Baseline or controlling line and all <br /> points as indicated on the plans or control sheet) upon final roadway completion . <br /> Include all intersections and side streets . State Plane Coordinates and elevations <br /> for all control points . <br /> 3 . Either if shown on plans or not: Any Public Land Corner or Governmental Survey <br /> Control point(s) , vertical control (bench marks) , property corners destroyed and/or <br /> disturbed during the scope of the project shall be properly re-established as per <br /> standards as set forth within Florida Statutes , Administrative code and Minimum <br /> Technical Standards for that type of survey. All said surveying mentioned above <br /> shall be performed under the direct supervision of a registered Professional <br /> Surveyor and Mapper in the state of Florida and certified accordingly . Said <br /> Governmental agency(s) shall be notified in writing of disturbance and re- <br /> establishments . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 101A - Mobilization - Lump Sum <br /> SECTION - 102 - MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform #o Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010 Edition ) , <br /> except as modified herein . <br /> A . GENERAL PROVISIONS- DESCRIPTION : The work specified in this Section consists <br /> of maintaining traffic within the limits of the project for the duration of the construction <br /> period , including any temporary suspensions of the work . It shall include the <br /> construction and maintenance of any necessary detour facilities ; the providing of <br /> necessary facilities for access to residences , businesses , etc. , along the project; the <br /> furnishing , installing and maintaining of traffic control and safety devices during <br /> construction , the control of dust through the use of calcium chloride if necessary , and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans . The term , Maintenance of Traffic, as used herein , shall include <br /> all of such facilities , devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance ; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section . <br /> B . BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor's activities . <br /> 010254 Technical Specifications <br /> r ., ,. .u: n ,acnr±iniccouv� nnacinni oan 19Zr TRN 1Q1 _IR Mud RociOnninn 41st St to 53rd St-SEE PROJ 0927\Admim\Contract <br />