My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
horizontal and vertical control shown on the engineering plans that was destroyed <br /> during construction . <br /> 2 . New roadway alignment control points (Survey Baseline or controlling line and all <br /> points as indicated on the plans or control sheet) upon final roadway completion . <br /> Include all intersections and side streets . State Plane Coordinates and elevations <br /> for all control points . <br /> 3 . Either if shown on plans or not: Any Public Land Corner or Governmental Survey <br /> Control point(s) , vertical control (bench marks) , property corners destroyed and/or <br /> disturbed during the scope of the project shall be properly re-established as per <br /> standards as set forth within Florida Statutes , Administrative code and Minimum <br /> Technical Standards for that type of survey. All said surveying mentioned above <br /> shall be performed under the direct supervision of a registered Professional <br /> Surveyor and Mapper in the state of Florida and certified accordingly . Said <br /> Governmental agency(s) shall be notified in writing of disturbance and re- <br /> establishments . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 101A - Mobilization - Lump Sum <br /> SECTION - 102 - MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform #o Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010 Edition ) , <br /> except as modified herein . <br /> A . GENERAL PROVISIONS- DESCRIPTION : The work specified in this Section consists <br /> of maintaining traffic within the limits of the project for the duration of the construction <br /> period , including any temporary suspensions of the work . It shall include the <br /> construction and maintenance of any necessary detour facilities ; the providing of <br /> necessary facilities for access to residences , businesses , etc. , along the project; the <br /> furnishing , installing and maintaining of traffic control and safety devices during <br /> construction , the control of dust through the use of calcium chloride if necessary , and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans . The term , Maintenance of Traffic, as used herein , shall include <br /> all of such facilities , devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance ; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section . <br /> B . BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor's activities . <br /> 010254 Technical Specifications <br /> r ., ,. .u: n ,acnr±iniccouv� nnacinni oan 19Zr TRN 1Q1 _IR Mud RociOnninn 41st St to 53rd St-SEE PROJ 0927\Admim\Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.