Laserfiche WebLink
G . Construction Site Egress Driveways : Minimize the transport of sediment and soil from <br /> the construction site or work area by vehicle wheels . Construct a crushed rock driving <br /> surface at the vehicle exit point(s) . Provide an area large enough to remove the <br /> sediment and soil from vehicle wheels before the vehicle leaves the construction site <br /> or work area . Provide wash-down stations as required to wash vehicle tires and retain <br /> all washwater on-site . Do not use limerock . <br /> H . Rock and Stone for Erosion Control and Pollution Control and Treatment: <br /> 1 . Crushed Limerock : Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non-calcareous aggregate ( usually granite) , <br /> Von <br /> washed and meeting the requirements of FDOT Standard Specifications for <br /> Road and Bridge Construction , Section 901 . <br /> I . Hay Bales : Hay bales shall not be used . <br /> PART 3 on EXECUTION <br /> A. Design , construct, and maintain the pollution control and treatment system to minimize <br /> erosion and capture and remove pollutants from the construction site and from all <br /> other areas disturbed by construction activities . <br /> Be Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 104= 1 — Erosion & Water Pollution Control on Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025=10 Technical Specifications <br /> c•� o. .tir., �nr.. a��cnira�niGcainin nivtcinni cRn. iFr.TC�� 131 _tR Rlvri Racnrfarinn d1ct Rttn ri3rd St SEF PROJ 0927\Admim\Contract <br /> I <br />