My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer's opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> I . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer, for optimum results . After being placed , the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until final acceptance , whichever is latest) . <br /> J . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project. Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor's negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6" without mowing . Clippings <br /> shall be removed from sidewalk . <br /> K. Article 5704 The first two paragraphs under this Article are deleted and the <br /> following substituted . <br /> The contract unit price for sodding shall include the costs of sod , fertilizer (2 <br /> applications) , sidewalk sweeping after mowing , mowing , pegging disposal of clippings , <br /> water, tools, equipment , labor and all other incidentals necessary. <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No . 570- 1 -2 — Performance Turf (Bahia or match existing) - Per Square <br /> Yard <br /> Bid Item No . 570A1 2A — Performance Turf ( Floratam or match existing ) we Per <br /> Square Yard <br /> SECTION — 700 - SIGNING AND PAVEMENT MARKINGS <br /> A. Signing and pavement marking for traffic control shall conform to the <br /> requirements of the Standard Specifications (2010) , Manual on Uniform Traffic Control <br /> Devices , Supplemental Specifications , Roadway and Traffic Design Standards , <br /> manufacturer's specifications . <br /> Be Traffic Signs : All existing signs which are the property of the Owner shall be <br /> transported to the Indian River County Road and Bridge Maintenance Yard by the <br /> Contractor during construction if they are within the construction limits . Care shall be <br /> exercised by the Contractor during removal , storage and relocation so as not to <br /> damage the signs . If any damage occurs , as determined by the Owner's Engineer or <br /> Resident Construction Inspector, the sign shall be replaced by the Contractor with no <br /> compensation . <br /> C . All reflective pavement markers shall be 4" x 4" . <br /> Addendum No. 1 11 -7-2012 <br /> 01025-15 Technical Specifications <br /> FAPuhlic WOrks\ENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.