My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-159A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 12:06:35 PM
Creation date
10/1/2015 2:44:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
07/19/2011
Control Number
2011-159A
Agenda Item Number
10.A.1
Entity Name
Division of Housing and Community Development
Subject
Community Development Block Grant Fiscal Year 2011
Neighborhood Revitalization Category
Supplemental fields
SmeadsoftID
10069
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Readiness to Proceed Score <br /> Readiness to Proceed points cannot be claimed if applicant is applying for a Planning and Design Specifications grant <br />. <br /> If biddable construction plans and specifications for all activities have been completed and submitted to all applicable <br /> permitting agencies no later <br /> than application deadline, score 100 points . Otherwise, score zero points . Include in the Supporting Documentation Section a <br /> letter from the <br /> engineer who prepared the construction plans and specifications stating the date the biddable construction documents were <br />completed and that <br /> they have been submitted to all applicable permitting agencies . <br /> Score 100 <br /> 100 Points Maximum <br /> Option Be A total of 25 points can be claimed if the activity will provide first-time sewer to an area , thereby <br /> addressing the health and safety <br /> issues associated with septic tanks . All CDBG funded construction activities must meet the requirements of this option to <br /> claim the full 25 points . <br /> Health and Safety Score <br /> e . Designate with an X the score that is appropriate : 690, 000 total construction cost 670,000 new sewer = ( 670 <br />/ 690 ) = <br /> . 97 * 25 = 24 . 25 <br /> A . Score Be Score x C . Score D . Score E . Score <br /> ( 50 Points) ( 25 Points) ( 25 Points) ( 20 Points) ( Prorated ) <br /> If D was selected , complete the following equation : <br /> $670, 000 1 $690, 000 , _ . 97 x 25 = 24 . 25 <br /> Enter the cost of Enter the CDBG Project Enter the result ( % ) as Enter the Appropriate <br /> activities subject to A ( B, Cost ( not Engineering or a four digit decimal Multiplier ( 20, 25 OR <br /> 50) SCORE <br /> C OR D) Admin Costs) <br /> Enter the appropriate Score : 24 . 25 50 Points Maximum <br /> Summary Score 478 . 79 <br /> (Transfer this score to the Scoring Summary) <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.