Laserfiche WebLink
Department, the NSP recipient, the sub-recipient organization, the developer organization <br /> and the housing rehabilitation specialist must accept the construction work on the <br /> residential housing unit as totally completed based upon the construction contract <br /> including any change orders . <br /> A. Moving Expenses <br /> This procedure will take place, if required, through one of two methods : <br /> 1 . Method One : The NSP sub -recipient or developer may choose to place the <br /> moving and storage of the qualifying family' s personal belongings out for <br /> bid , with the firm submitting the lowest acceptable bid being awarded the <br /> contract. <br /> 2 . Method Two : The NSP sub-recipient or developer will provide the family <br /> with moving expenses totaling three hundred dollars ($ 300 . 00) . One <br /> hundred and fifty dollars ( $ 150 . 00) will be provided when the family <br /> moves its belongings from the dwelling unit to a central storage location, <br /> and one hundred fifty dollars ( $ 150 . 00) will be provided when the family <br /> moves its belongings from the central storage location back to the <br /> dwelling unit after the unit has been rehabilitated or replaced . <br /> The local government will receive price quotes from a minimum of three <br /> storage facilities centrally located to the area and provide the owner with a <br /> standard sized storage unit in the storage facility that provides the lowest <br /> price . The family may utilize the storage unit during the period of <br /> construction on its residential housing unit . The family is responsible for <br /> providing its own lock and maintaining all keys to the storage unit . All <br /> personal belongings shall be removed from the dwelling within 10 days of <br /> receipt of written notification to vacate the dwelling from the Project <br /> Manager. Vacating the dwelling shall include the removal of all trash and <br /> debris from the dwelling and the surrounding property . The owner is to <br /> remove all items from the storage unit and sweep out the storage unit <br /> within 10 days after receipt of written notification that a " Certificate of <br /> Completion" or " Certificate of Occupancy" for the rehabilitation or <br /> replacement of the recipient ' s dwelling has been issued . <br /> Method two provides the recipient with greater access to his belongings . <br /> Neither the NSP recipient nor the Housing Specialist/Consultant shall hold any liability in <br /> loss, damage or theft of any or all personal belongings of the recipient . It is the family' s <br /> responsibility to pack all belongings within 10 days of written notification to vacate the <br /> dwelling. All trash and debris shall be removed by the family before a ` Notice to <br /> Proceed" will be issued to the rehabilitation or demolition contractor. The family is to <br /> remove all items from and sweep out the storage facility with in 10 days after receipt of <br /> written notification by the Housing Specialist/Consultant of the Building Department ' s <br /> 16 <br />