Laserfiche WebLink
aVf� <br /> Board of County Commissioners <br /> Administration - Building A <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 567- 8000 FAX : 772-778 -9391 <br /> Project : <br /> Vertical Network Densification <br /> Indian River County Project 1050 <br /> WORK ORDER NO . 1 ( Engineering/Surveying ) <br /> FOR <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING/GIS SERVICES <br /> WITH <br /> Creech Engineers , Inc. <br /> In accordance with Contract No . 1032 2010-2011 <br /> This Work Order No . 1 is in accordance with the existing AGREEMENT dated October 19 , 2010 <br /> between Creech Engineers , Inc. , ( SURVEYOR) and Indian River County ( COUNTY) . This Work <br /> Order No . 1 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 1 is for the SURVEYOR to perform all related field and office Surveying <br /> and Mapping services in connection with the Vertical Control Network Densification , consisting <br /> of the establishment of twenty-six Benchmarks meeting 2nd Order, Class B Stability . <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br /> Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 1 ; <br /> specifically detailed in the attached proposal Exhibit A . <br /> SECTION III — TIME FOR COMPLETION & DELIVERABLESMORK PRODUCT <br /> 1 . Project shall be completed as follows : <br /> a . The SURVEYOR will complete all field monumentation and measurements within <br /> 130 calendar days from receipt of the Notice to Proceed from the COUNTY . <br /> b . The SURVEYOR will submit a preliminary submittal to the National Geodetic <br /> Survey ( NGS) , within 160 calendar days from receipt of the Notice to Proceed from <br /> the COUNTY <br /> c . Final Deliverables to the COUNTY are anticipated to be completed within two <br /> months after the submittal of the preliminary data as described in Item b above . <br /> • The scheduled review and acceptance by the NGS depends heavily on their <br /> work load at the time of submittal and may vary greatly. <br /> F :\PublicWorks\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work <br /> Orders\08-03-2011 BCC Consent Agenda\08-03-2011 IRC WO No. 1 - Job No. 1050 .doc <br />