revisions made other than the corrections requested by the Engineer on previous <br /> submissions . <br /> F . Partial submittals may not be reviewed . The Engineer will be the only judge as to the <br /> completeness of a submittal . Submittals not complete will be returned to the Contractor <br /> and will be considered " Not Approved " until resubmitted . The Engineer may at his option <br /> provide a list or mark the submittal directing the Contractor to the areas that are <br /> incomplete . <br /> G . Repetitive Review <br /> 1 . Shop Drawings and other submittals will be reviewed no more than twice at the <br /> Owner ' s expense . All subsequent reviews will be performed at times convenient <br /> to the Engineer and at the Contractor ' s expense based on the Engineer ' s then <br /> prevailing rates . The Contractor shall reimburse the Owner for all such fees <br /> invoiced to the Owner by the Engineer. Submittals are required until approved , <br /> 2 . Any need for more than one resubmission , or any other delay in obtaining <br /> Engineer ' s review of submittal will not entitle Contractor to extension of the <br /> contract time . <br /> H . If the Contractor considers any correction indicated on the shop drawings to constitute a <br /> change to the Contract Documents , the Contractor shall give written notice thereof to the <br /> Engineer at least 7 working days prior to release for manufacture . <br /> I . When the shop drawings have been completed to the satisfaction of the Engineer, the <br /> Contractor shall carry out the construction in accordance therewith and shall make no <br /> further changes therein except upon written instructions from the Engineer . <br /> 1 . 06 DISTRIBUTION <br /> A . Distribute reproductions of approved shop drawings and copies of approved product data <br /> and samples , where required , to the job site file and elsewhere as directed by the Engineer . <br /> Number of copies shall be as directed by the Engineer but shall not exceed six . <br /> 1 . 07 GENERAL PROCEDURES FOR SUBMITTALS <br /> A . Coordination of Submittal Times : Prepare and transmit each submittal sufficiently in <br /> advance of performing the related work or other applicable activities , or within the time <br /> specified in the individual work of other related Sections, so that the installation will not <br /> be delayed by processing times including disapproval and resubmittal ( if required ), <br /> coordination with other submittals, testing, purchasing, fabrication , delivery and similar <br /> sequenced activities . No extension of time will be authorized because of the Contractor' s <br /> failure to transmit submittals sufficiently in advance of the Work . All submittals are to be <br /> sent to L . R . Brown , PE , Indian River County for approval . <br /> END OF SECTION <br /> 01340 - 5 <br />