My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a ) ( a ) Within 150 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be utilized in <br /> the job . <br /> 3 . Locate all existing utilities in the area of work . <br /> 4 . Submit and secure approval of shop drawings <br /> 5 . Mobilize all labor , equipment , and materials . <br /> 6 . Deliver and store all equipment and materials . <br /> 7 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From 151 calendar days to 210 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Complete hardware installation <br /> 2 . Complete system programming and configuration <br /> 3 Complete system validation testing <br /> 3 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c ) From 211 calendar days to 241 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a , b , and c ) constitute Final <br /> Completion . <br /> 3 . 3 Liquidated Damages . OWNER and CONTRACTOR recognize that time is of the essence <br /> of this Agreement and that OWNER will suffer financial loss if the work is not completed <br /> within the times specified in Paragraph 3 . 1 above , plus any extensions thereof allowed in <br /> accordance with Article 12 of the General Conditions . They also recognize the delays , <br /> expense , and difficulties involved in proving in a legal proceeding the actual loss suffered <br /> by OWNER if the work is not completed on time . Accordingly , instead of requiring any <br /> such proof , OWNER and CONTRACTOR agree that as liquidated damages for delay ( but <br /> not as a penalty ) CONTRACTOR shall pay OWNER Four Hundred Fifty Dollars <br /> ( $ 450 . 00 ) for each day that expires after the time specified in Paragraph 3 . 1 Completion . <br /> 00530-2 <br /> FAIJ ititiPc\ i iTn iTY . EMPLOYEE FOLDERS\Larry Brown\Front End Docs\00530 Aareement Reuse Automation . doc <br />