requirements of the Work and the Contract revisions other than the corrections called for by <br /> Documents . Engineer on previous submittals . <br /> 2 . Each submittal shall bear a stamp or specific 6 . 18 Continuing the Work <br /> written certification that Contractor has satisfied <br /> Contractor ' s obligations under the Contract A . Contractor shall carry on the Work and adhere to the <br /> Documents with respect to Contractor ' s review and Progress Schedule during all disputes or disagreements <br /> approval of that submittal . with Owner . No Work shall be delayed or postponed <br /> pending resolution of any disputes or disagreements , <br /> 3 . With each submittal , Contractor shall give except as permitted by Paragraph 15 . 04 or as Owner and <br /> Engineer specific written notice of any variations, Contractor may otherwise agree in writing . <br /> that the Shop Drawing or Sample may have from the <br /> requirements of the Contract Documents . This notice 6 . 19 Contractor 's General Warranty and Guarantee <br /> shall be both a written communication separate from <br /> the Shop Drawing ' s or Sample Submittal ; and , in A . Contractor warrants and guarantees to Owner that all <br /> addition , by a specific notation made on each Shop Work will be in accordance with the Contract Documents <br /> Drawing or Sample submitted to Engineer for review and will not be defective . Engineer and its Related <br /> and approval of each such variation . Entities shall be entitled to rely on representation of <br /> Contractor ' s warranty and guarantee . <br /> D . Engineer ' s Review <br /> B . Contractor ' s warranty and guarantee hereunder <br /> 1 . Engineer will provide timely review of Shop excludes defects or damage caused by : <br /> Drawings and Samples in accordance with the Sched - <br /> ule of Submittals acceptable to Engineer. Engineer ' s 1 . abuse, modification , or improper maintenance or <br /> review and approval will be only to determine if the operation by persons other than Contractor, Sub <br />- <br /> items covered by the submittals will , after installation contractors , Suppliers , or any other individual or <br /> or incorporation in the Work, conform to the entity for whom Contractor is responsible; or <br /> information given in the Contract Documents and be <br /> compatible with the design concept of the completed 2 . normal wear and tear under normal usage . <br /> Project as a functioning whole as indicated by the <br /> Contract Documents . C . Contractor ' s obligation to perform and complete the <br /> Work in accordance with the Contract Documents shall be <br /> 2 . Engineer ' s review and approval will not extend absolute . None of the following will constitute an <br /> to means, methods, techniques, sequences , or acceptance of Work that is not in accordance with the <br /> procedures of construction (except where a particular Contract Documents or a release of Contractor ' s <br /> means , method , technique, sequence, or procedure of obligation to perform the Work in accordance with the <br /> construction is specifically and expressly called for Contract Documents : <br /> by the Contract Documents ) or to safety precautions <br /> or programs incident thereto . The review and 1 . observations by Engineer; <br /> approval of a separate item as such will not indicate <br /> approval of the assembly in which the item functions . 2 . recommendation by Engineer or payment by <br /> Owner of any progress or final payment ; <br /> 3 . Engineer ' s review and approval shall not relieve <br /> Contractor from responsibility for any variation from 3 . the issuance of a certificate of Substantial <br /> the requirements of the Contract Documents unless Completion by Engineer or any payment related <br /> Contractor has complied with the requirements of thereto by Owner; <br /> Paragraph 6 . 17 . C . 3 and Engineer has given written <br /> approval of each such variation by specific written 4 . use or occupancy of the Work or any part thereof <br /> notation thereof incorporated in or accompanying the by Owner; <br /> Shop Drawing or Sample . Engineer' s review and <br /> approval shall not relieve Contractor from 5 . any review and approval of a Shop Drawing or <br /> responsibility for complying with the requirements of Sample submittal or the issuance of a notice of <br /> Paragraph 6 . 17 . C . I . acceptability by Engineer; <br /> E. Resubmittal Procedures 6 . any inspection , test, or approval by others; or <br /> 1 . Contractor shall make corrections required by 7 . any correction of defective Work by Owner. <br /> Engineer and shall return the required number of cor- <br /> rected copies of Shop Drawings and submit , as <br /> required , new Samples for review and approval . <br /> Contractor shall direct specific attention in writing to <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 24 <br />