Laserfiche WebLink
B . Contractor shall afford each other contractor who is a disruption costs incurred by Contractor as a result of the <br /> party to such a direct contract, each utility owner and other contractor' s actions or inactions . <br /> Owner, if Owner is performing other work with Owner ' s <br /> employees , proper and safe access to the Site , a reason - C . Contractor shall be liable to Owner and any other <br /> able opportunity for the introduction and storage of contractor for the reasonable direct delay and disruption <br /> materials and equipment and the execution of such other costs incurred by such other contractor as a result of <br /> work, and shall properly coordinate the Work with theirs . Contractor ' s action or inactions . <br /> Contractor shall do all cutting, fitting, and patching of the <br /> Work that may be required to properly connect or <br /> otherwise make its several parts come together and ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> properly integrate with such other work . Contractor shall <br /> not endanger any work of others by cutting , excavating, <br /> or otherwise altering their work and will only cut or alter 8 . 01 Communications to Contractor <br /> their work with the written consent of Engineer and the <br /> others whose work will be affected . The duties and A . Except as otherwise provided in these General Condi - <br /> responsibilities of Contractor under this Paragraph are for tions , Owner shall issue all communications to Contractor <br /> the benefit of such utility owners and other contractors to through Engineer. <br /> the extent that there are comparable provisions for the <br /> benefit of Contractor in said direct contracts between 8 . 02 Replacement of Engineer <br /> Owner and such utility owners and other contractors . <br /> A . In case of termination of the employment of Engineer, <br /> C . If the proper execution or results of any part of Owner shall appoint an engineer to whom Contractor <br /> Contractor ' s Work depends upon work performed by makes no reasonable objection , whose status under the <br /> others under this Article 7 , Contractor shall inspect such Contract Documents shall be that of the former Engineer . <br /> other work and promptly report to Engineer in writing any <br /> delays , defects , or deficiencies in such other work that 8 . 03 Furnish Data <br /> render it unavailable or unsuitable for the proper <br /> execution and results of Contractor ' s Work . Contractor' s A . Owner shall promptly furnish the data required of <br /> failure to so report will constitute an acceptance of such Owner under the Contract Documents . <br /> other work as fit and proper for integration with <br /> Contractor ' s Work except for latent defects and 8 . 04 Pay When Due <br /> deficiencies in such other work . <br /> A . Owner shall make payments to Contractor when they <br /> 7 . 02 Coordination are due as provided in Paragraphs 14 . 02 . 0 and 14 . 07 . C . <br /> A . If Owner intends to contract with others for the 8 . 05 Lands and Easements; Reports and Tests <br /> performance of other work on the Project at the Site , the <br /> following will be set forth in Supplementary Conditions : A . Owner ' s duties in respect of providing lands and <br /> easements and providing engineering surveys to establish <br /> 1 . the individual or entity who will have authority reference points are set forth in Paragraphs 4 . 01 and 4 . 05 <br /> . <br /> and responsibility for coordination of the activities Paragraph 4 . 02 refers to Owner' s identifying and making <br /> among the various contractors will be identified ; available to Contractor copies of reports of explorations <br /> and tests of subsurface conditions and drawings of <br /> 2 . the specific matters to be covered by such physical conditions in or relating to existing surface or <br /> authority and responsibility will be itemized; and subsurface structures at or contiguous to the Site that have <br /> been utilized by Engineer in preparing the Contract <br /> J . the extent of such authority and responsibilities Documents . <br /> will be provided . <br /> 8 . 06 Insurance <br /> B . Unless otherwise provided in the Supplementary <br /> Conditions , Owner shall have sole authority and respon - A . Owner ' s responsibilities , if any , in respect to pur- <br /> sibility for such coordination . chasing and maintaining liability and property insurance <br /> are set forth in Article 5 . <br /> 7 . 03 Legal Relationships <br /> 8 . 07 Change Orders <br /> A . Paragraphs 7 . 0 LA and 7 .02 are not applicable for <br /> utilities not under the control of Owner. A . Owner is obligated to execute Change Orders as <br /> indicated in Paragraph 10 . 03 . <br /> B . Each other direct contract of Owner under Paragraph <br /> 7 . 0 LA shall provide that the other contractor is liable to <br /> Owner and Contractor for the reasonable direct delay and <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 26 <br />