Contract Documents . Engineer will also have authority to C . Engineer ' s written decision on the issue referred will
<br /> require special inspection or testing of the Work as be final and binding on Owner and Contractor, subject to
<br /> provided in Paragraph 13 . 04, whether or not the Work is the provisions of Paragraph 10 . 05 .
<br /> fabricated , installed , or completed .
<br /> D . When functioning as interpreter and judge under this
<br /> 9 . 06 Shop Drawings, Change Orders and Payments Paragraph 9 . 08 , Engineer will not show partiality to
<br /> Owner or Contractor and will not be liable in connection
<br /> A . In connection with Engineer ' s authority, and with any interpretation or decision rendered in good faith
<br /> limitations thereof, as to Shop Drawings and Samples , see in such capacity .
<br /> Paragraph 6 . 17 .
<br /> 9 . 09 Limitations on Engineer 's Authority and
<br /> B . In connection with Engineer ' s authority , and Responsibilities
<br /> limitations thereof, as to design calculations and design
<br /> drawings submitted in response to a delegation of A . Neither Engineer ' s authority or responsibility under
<br /> professional design services , if any , see Paragraph 6 . 21 . this Article 9 or under any other provision of the Contract
<br /> Documents nor any decision made by Engineer in good
<br /> C . In connection with Engineer' s authority as to Change faith either to exercise or not exercise such authority or
<br /> Orders , see Articles 10 , I I . and 12 . responsibility or the undertaking , exercise , or
<br /> performance of any authority or responsibility by
<br /> D . In connection with Engineer ' s authority as to Engineer shall create , impose , or give rise to any duty in
<br /> Applications for Payment, see Article 14 . contract, tort, or otherwise owed by Engineer to
<br /> Contractor, any Subcontractor, any Supplier, any other
<br /> 9 . 07 Determinations for Unit Price 141'ork individual or entity , or to any surety for or employee or
<br /> agent of any of them .
<br /> A . Engineer will determine the actual quantities and
<br /> classifications of Unit Price Work performed by B . Engineer will not supervise , direct , control , or have
<br /> Contractor. Engineer will review with Contractor the authority over or be responsible for Contractor ' s means ,
<br /> Engineer' s preliminary determinations on such matters methods , techniques , sequences , or procedures of
<br /> before rendering a written decision thereon (by construction , or the safety precautions and programs
<br /> recommendation of an Application for Payment or incident thereto , or for any failure of Contractor to
<br /> otherwise) . Engineer' s written decision thereon will be comply with Laws and Regulations applicable to the
<br /> final and binding (except as modified by Engineer to performance of the Work . Engineer will not be respon-
<br /> reflect changed factual conditions or more accurate data) sible for Contractor ' s failure to perform the Work in
<br /> upon Owner and Contractor, subject to the provisions of accordance with the Contract Documents .
<br /> Paragraph 10 . 05 .
<br /> C . Engineer will not be responsible for the acts or
<br /> 9 . 08 Decisions on Requirements of Contract omissions of Contractor or of any Subcontractor, any
<br /> Documents and Acceptability of Work Supplier, or of any other individual or entity performing
<br /> any of the Work .
<br /> A . Engineer will be the initial interpreter of the
<br /> requirements of the Contract Documents and judge of the D . Engineer ' s review of the final Application for Payment
<br /> acceptability of the Work thereunder. All matters in and accompanying documentation and all maintenance
<br /> question and other matters between Owner and Contractor and operating instructions , schedules , guarantees , bonds ,
<br /> arising prior to the date final payment is due relating to certificates of inspection , tests and approvals , and other
<br /> the acceptability of the Work, and the interpretation of the documentation required to be delivered by Paragraph
<br /> requirements of the Contract Documents pertaining to the 14 . 07 .A will only be to determine generally that their
<br /> performance of the Work , will be referred initially to content complies with the requirements of, and in the case
<br /> Engineer in writing within 30 days of the event giving rise of certificates of inspections , tests , and approvals that the
<br /> to the question results certified indicate compliance with the Contract
<br /> Documents .
<br /> B . Engineer will , with reasonable promptness , render a
<br /> written decision on the issue referred . If Owner or E . The limitations upon authority and responsibility set
<br /> Contractor believe that any such decision entitles them to forth in this Paragraph 9 . 09 shall also apply to , the
<br /> an adjustment in the Contract Price or Contract Times or Resident Project Representative, if any , and assistants , if
<br /> both , a Claim may be made under Paragraph 10 . 05 . The any .
<br /> date of Engineer ' s decision shall be the date of the event
<br /> giving rise to the issues referenced for the purposes of
<br /> Paragraph 10 . 05 . 13 .
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved .
<br /> 00700 - 28