Laserfiche WebLink
Subcontractor and Contractor will each be paid a C . If Contractor is delayed in the performance or progress <br /> fee of five percent of the amount paid to the next of the Work by fire, flood , epidemic, abnormal weather <br /> lower tier Subcontractor; conditions , acts of God , acts or failures to act of utility <br /> owners not under the control of Owner, or other causes <br /> d . no fee shall be payable on the basis of costs not the fault of and beyond control of Owner and <br /> itemized under Paragraphs 1 1 . 0l . A . 4 , 11 . 0l . A . 5 , Contractor, then Contractor shall be entitled to an <br /> and 11 . 01 . 13 ; equitable adjustment in Contract Times , if such <br /> adjustment is essential to Contractor ' s ability to complete <br /> e . the amount of credit to be allowed by the Work within the Contract Times . Such an adjustment <br /> Contractor to Owner for any change which shall be Contractor ' s sole and exclusive remedy for the <br /> results in a net decrease in cost will be the delays described in this Paragraph 12 . 03 . C . <br /> amount of the actual net decrease in cost plus a <br /> deduction in Contractor ' s fee by an amount equal D . Owner, Engineer and the Related Entities of each of <br /> to five percent of such net decrease ; and them shall not be liable to Contractor for any claims , <br /> costs, losses , or damages (including but not limited to all <br /> f. when both additions and credits are involved fees and charges of Engineers, architects , attorneys , and <br /> in any one change, the adjustment in other professionals and all court or arbitration or other <br /> Contractor ' s fee shall be computed on the basis dispute resolution costs) sustained by Contractor on or in <br /> of the net change in accordance with Paragraphs connection with any other project or anticipated project. <br /> 12 . 01 . C . 2 . a through 12 . 01 . C . 2 . e , inclusive . <br /> E . Contractor shall not be entitled to an adjustment in <br /> 12 . 02 Change of Contract "Times Contract Price or Contract Times for delays within the <br /> control of Contractor. Delays attributable to and within <br /> A . The Contract Times may only be changed by a Change the control of a Subcontractor or Supplier shall be deemed <br /> Order. Any Claim for an adjustment in the Contract to be delays within the control of Contractor . <br /> Times shall be based on written notice submitted by the <br /> party making the Claim to the Engineer and the other <br /> party to the Contract in accordance with the provisions of ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> Paragraph 10 . 05 . CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> DEFECTIVE WORK <br /> B . Any adjustment of the Contract Times covered by a <br /> Change Order or any Claim for an adjustment in the <br /> Contract Times will be determined in accordance with the 13 . 01 Notice of Defects <br /> provisions of this Article 12 . <br /> A . Prompt notice of all defective Work of which Owner <br /> 12 . 03 Delays or Engineer has actual knowledge will be given to <br /> Contractor. All defective Work may be rejected , <br /> A . Where Contractor is prevented from completing any corrected , or accepted as provided in this Article 13 . <br /> part of the Work within the Contract Times due to delay <br /> beyond the control of Contractor, the Contract Times will 13 . 02 Access to Work <br /> be extended in an amount equal to the time lost due to <br /> such delay if a Claim is made therefor as provided in A . Owner, Engineer, their consultants and other <br /> Paragraph 12 . 02 . A . Delays beyond the control of representatives and personnel of Owner, independent <br /> Contractor shall include , but not be limited to , acts or testing laboratories , and governmental agencies with <br /> neglect by Owner, acts or neglect of utility owners or jurisdictional interests will have access to the Site and the <br /> other contractors performing other work as contemplated Work at reasonable times for their observation , <br /> by Article 7 , fires , floods, epidemics , abnormal weather inspecting, and testing . Contractor shall provide them <br /> conditions , or acts of God . proper and safe conditions for such access and advise <br /> them of Contractor ' s Site safety procedures and programs <br /> B . If Owner, Engineer, or other contractors or utility so that they may comply therewith as applicable . <br /> owners performing other work for Owner as contemplated <br /> by Article 7 , or anyone for whom Owner is responsible , 13 . 03 Tests and Inspections <br /> delays , disrupts , or interferes with the performance or <br /> progress of the Work, then Contractor shall be entitled to A . Contractor shall give Engineer timely notice of <br /> an equitable adjustment in the Contract Price or the readiness of the Work for all required inspections, tests, <br /> Contract Times , or both . Contractor ' s entitlement to an or approvals and shall cooperate with inspection and <br /> adjustment of the Contract Times is conditioned on such testing personnel to facilitate required inspections or tests . <br /> adjustment being essential to Contractor ' s ability to <br /> complete the Work within the Contract Times . B . Owner shall employ and pay for the services of an <br /> independent testing laboratory to perform all inspections , <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 33 <br />