My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
evidence of insurance required by Paragraph 14 . 08 Final Completion Delayed <br /> 5 .04 .13 . 7 ; <br /> A . If, through no fault of Contractor, final completion of <br /> b . consent of the surety , if any , to final payment; the Work is significantly delayed , and if Engineer so <br /> confirms , Owner shall , upon receipt of Contractor' s final <br /> c . a list of all Claims against Owner that Application for Payment (for Work fully completed and <br /> Contractor believes are unsettled ; and accepted) and recommendation of Engineer, and without <br /> terminating the Contract, make payment of the balance <br /> d . complete and legally effective releases or due for that portion of the Work fully completed and <br /> waivers (satisfactory to Owner) of all Lien rights accepted . If the remaining balance to be held by Owner <br /> arising out of or Liens filed in connection with for Work not fully completed or corrected is less than the <br /> the Work . retainage stipulated in the Agreement, and if bonds have <br /> been furnished as required in Paragraph 5 . 01 , the written <br /> 3 . In lieu of the releases or waivers of Liens consent of the surety to the payment of the balance <br /> due <br /> specified in Paragraph 14 . 07 . A . 2 and as approved by for that portion of the Work fully completed and accepted <br /> Owner, Contractor may furnish receipts or releases in shall be submitted by Contractor to Engineer with the <br /> full and an affidavit of Contractor that : ( i ) the Application for such payment . Such payment shall be <br /> releases and receipts include all labor, services , made under the terms and conditions governing final <br /> material , and equipment for which a Lien could be payment, except that it shall not constitute a waiver of <br /> filed ; and ( ii) all payrolls , material and equipment Claims . <br /> bills , and other indebtedness connected with the <br /> Work for which Owner or Owner' s property might in 14 . 09 Waiver of Claims <br /> any way be responsible have been paid or otherwise <br /> satisfied . If any Subcontractor or Supplier fails to A . The making and acceptance of final payment will <br /> furnish such a release or receipt in full , Contractor constitute : <br /> may furnish a bond or other collateral satisfactory to <br /> Owner to indemnify Owner against any Lien . 1 . a waiver of all Claims by Owner against <br /> Contractor, except Claims arising from unsettled <br /> B . Engineer' s Review of Application and Acceptance Liens , from defective Work appearing after final <br /> inspection pursuant to Paragraph 14 . 06 , from failure <br /> 1 . if, on the basis of Engineer' s observation of the to comply with the Contract Documents or the terms <br /> Work during construction and final inspection , and of any special guarantees specified therein , or from <br /> Engineer ' s review of the final Application for Contractor ' s continuing obligations under the <br /> Payment and accompanying documentation as re- Contract Documents ; and <br /> quired by the Contract Documents , Engineer is <br /> satisfied that the Work has been completed and 2 . a waiver of all Claims by Contractor <br />against <br /> Contractor' s other obligations under the Contract Owner other than those previously made in <br /> Documents have been fulfilled , Engineer will , within accordance with the requirements herein and <br /> ten days after receipt of the final Application for expressly acknowledged by Owner in writing as still <br /> Payment, indicate in writing Engineer ' s recommen - unsettled . <br /> dation of payment and present the Application for <br /> Payment to Owner for payment. At the same time <br /> Engineer will also give written notice to Owner and ARTICLE 15 - SUSPENSION OF WORK AND <br /> Contractor that the Work is acceptable subject to the TERMINATION <br /> provisions of Paragraph 14 . 09 . Otherwise , Engineer <br /> will return the Application for Payment to <br /> Contractor, indicating in writing the reasons for 15 . 01 Owner May Suspend Work <br /> refusing to recommend final payment, in which case <br /> Contractor shall make the necessary corrections and A . At any time and without cause , Owner may suspend <br /> resubmit the Application for Payment. the Work or any portion thereof for a period of not more <br /> than 90 consecutive days by notice in writing to <br /> C . Payment Becomes Due Contractor and Engineer which will fix the date on which <br /> Work will be resumed . Contractor shall resume the Work <br /> 1 . Thirty days after the presentation to Owner of on the date so fixed . Contractor shall be granted an adjust- <br /> the Application for Payment and accompanying ment in the Contract Price or an extension of the Contract <br /> documentation , the amount recommended by Times , or both , directly attributable to any such <br /> Engineer, less any sum Owner is entitled to set off suspension if Contractor makes a Claim therefor as <br /> against Engineer ' s recommendation , including but provided in Paragraph 10 . 05 . <br /> not limited to liquidated damages , will become due <br /> and , will be paid by Owner to Contractor . <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.