My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br /> AMENDMENTS TO GENERAL CONDITIONS <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract ( EJCDC Document No . C -700 , 2002 edition ) and other provisions of the Contract <br /> Documents as indicated below . All provisions which are not so amended or supplemented remain in full <br /> force and effect . <br /> ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br /> SC - 1 . 01A . 43 . <br /> Delete paragraph 1 . 01A . 43 . of the General Conditions in its entirety and replace with the following : <br /> 43 . Specifications - Sections included under Division 1 through Division 2 of the Project Manual . <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> SC - 2 . 01 B . <br /> Delete paragraph 2 . 01 B of the General Conditions in its entirety and replace with the following : <br /> B . Before any Work at the site is started , Contractor shall deliver to Owner , with copies to Engineer <br />, <br /> certificates of insurance , which Contractor is required to purchase and maintain in accordance with the <br /> requirements of the Contract Documents . <br /> SC 2 . 03A <br /> Delete paragraph 2 . 03A of the General Conditions in its entirety , and replace with the following : <br /> The Contract Times will commence to run on the day indicated in the Notice to Proceed . A Notice to <br /> Proceed may be given at any time within 60 days after the Effective Date of the Agreement . <br /> SC 2 . 05A1 Add the following immediately at the end of subparagraph 2 . 05A1 : using the Critical Path <br /> Method ( CPM ) . <br /> SC 2 . 05A . 4 Add new subparagraph 4 after the existing text of 2 . 05 of the General Conditions : <br /> 4 . If this Project is an addition to an existing working plant , then the Contractor shall coordinate with the <br /> Owner on tie - ins . The Owner shall have final say on plant shut down times and duration to make tie - ins . <br /> ARTICLE 3 = CONTRACT DOCUMENTS : INTENT , AMENDING , REUSE <br /> SC - 3 . 01 C <br /> Add a new paragraph immediately after Paragraph 3 . 01 C of the General Conditions which is to read as <br /> follows : <br /> D . Each and every provision of law and clause required by law to be inserted in these Contract Documents <br /> shall be deemed to be inserted herein , and they shall be read and enforced as though it were included <br /> herein . <br /> 00800-3 <br /> F :\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - Reuse Automation- UCP 4065\Bid Documents - Reuse <br /> Automation\00800 Supplementary Conditions Reuse Automation . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.