My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor' s responsibility to develop and maintain an erosion control plan at all times . The selected <br /> Contractor shall obtain an Indian River County dewatering permit , if such permit is required . <br /> Contractor acknowledges that the foregoing items are governed by the provisions of Florida Statutes <br /> section 218 . 80 ( 2006) , Public Bid Disclosure Act . <br /> SC 6 . 11 A . 3 : Delete the words : " arbitration or" in line 9 of paragraph 6 . 11 A . 3 of the General Conditions . <br /> SC 6 . 19A : Delete Paragraph 6 . 19A . of the General Conditions in its entirety and replace with the following : <br /> A . Contractor warrants and guarantees to Owner for one ( 1 ) year from the date of Final Completion that <br /> all Work will be in accordance with the Contract Documents and will not be defective ; provided , however , <br /> that manufacturer equipment warranties may be of a longer duration . <br /> SC -6 . 20A <br /> Delete paragraph 6 . 20A of the General Conditions in its entirety . <br /> SC -6 . 21 E <br /> Delete paragraph 6 . 21 E of the General Conditions in its entirety and replace with the following : <br /> E . Contractor shall not be responsible for the adequacy of the performance criteria or design criteria <br /> required by or contained in the Contract Documents . <br /> ARTICLE 7 — OTHER WORK AT THE SITE <br /> No Changes <br /> ARTICLE 8 OWNER' S RESPONSIBILITIES <br /> SC - 8 . 02 Delete paragraph 8 . 02 of the General Conditions in its entirety and replace with the following : <br /> If Owner terminates the employment of Engineer , Owner may appoint another engineer whose status <br /> under the Contract Documents shall be that of the former Engineer . <br /> SC - 8 . 04 Delete paragraph 8 . 04 of the General Conditions in its entirety and replace with the following : <br /> Payments under this contract are governed by the Local Government Prompt Payment Act , Florida <br /> Statutes section 218 . 70 et . seq . , <br /> SC - 8 . 06 <br /> Delete paragraph 8 . 06 of the General Conditions in its entirety . <br /> SC - 8 . 11 <br /> Delete paragraph 8 . 11 of the General Conditions in its entirety . <br /> ARTICLE 9 - ENGINEER' S STATUS DURING CONSTRUCTION <br /> SC 9 . 02 Delete the first sentence of paragraph 9 . 03A of the General Conditions in its entirety and replace <br /> with the following : <br /> 00800-9 <br /> FAUtilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - Reuse Automation- UCP 4065\Bid Documents - Reuse <br /> Automation\00800 Supplementary Conditions Reuse Automation . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.