ARTICLE 11 - COST OF THE WORK ; ALLOWANCES ; UNIT PRICE WORK <br /> SC - 11 . 02A Delete paragraph 11 . 02 . A of the General Conditions in its entirety and replace with the <br /> following : <br /> It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the <br /> Contract Documents and shall cause the Work so covered to be performed for such sums as may be <br /> acceptable to OWNER . <br /> Delete paragraphs 11 . 02B through D of the General Conditions in their entirety . <br /> ARTICLE 12 - CHANGE OF CONTRACT PRICE ; CHANGE OF CONTRACT TIMES <br /> SC12 . 01 C Delete " 15 percent" in line 2 of paragraph 12 . 01 C . 2 . a of the General Conditions and replace <br /> with " 10 percent" . <br /> SC12 . 01 C Delete " 15 percent" in line 6 of paragraph 12 . 01 C . 2 . c of the General Conditions and replace <br /> with 10 percent" . <br /> 12 . 03A and B Delete paragraphs 12 . 03 . A and 12 . 03B of the General Conditions in their entirety and <br /> replace with the following : <br /> A . Where Contractor is delayed or prevented from completing any part of the Work within the Contract <br /> Times due to delay beyond the control of Contractor , the Contract Times (or Milestones ) will be extended <br /> in an amount equal to the time lost due to such delay if M a Claim is made therefore as provided <br />in <br /> paragraph 12 . 02 . A and (2 ) Contractor provides evidence that the delay impacted the critical path of the <br /> Project . Delays beyond the control of Contractor shall include , but not be limited to , acts or neglect by <br /> Owner, acts or neglect of utility owners or other contractors performing other work as contemplated by <br /> Article 7 , fires , floods , abnormal weather conditions , or acts of God . The Contractor must request the <br /> extension of time in writing and must provide the following information within the time periods stated <br /> hereafter . Failure to submit such information and in compliance with the time requirements hereinafter <br /> stated , shall constitute a waiver by the Contractor and a denial of the claim for extension of time : <br /> 1 . Nature of the delay or change in the Work ; <br /> 2 . Dates of commencement and cessation of the delay or change in the Work ; <br /> 3 . Activities on the current progress schedule affected by the delay or change in the Work ; <br /> 4 . Identification and demonstration that the delay or change in Work affects the critical path ; <br /> 5 . Identification of the source of delay or change in the Work ; <br /> 6 . Anticipated extent of the delay or change in the Work ; and <br /> 7 . Recommended action to minimize the delay . <br /> B . Contractor hereby affirms that the extension of time granted herein is the Contractor' s sole and <br /> exclusive remedy . Apart from extension of time , no payment or claim for damages shall be made to the <br /> Contractor as compensation for damages for any delays or hindrances from any cause whatsoever in the <br /> progress of the Work whether such delay is avoidable or unavoidable . <br /> SC 12 . 03C Delete paragraph 12 . 03 . 0 of the General Conditions in its entirety . <br /> SC 12 . 03D Delete paragraph 12 . 03D of the General Conditions in its entirety and replace with the <br /> following : <br /> 00800 - 12 <br /> F :\Utilities\UTILITY - Engineering \Projects - Utility Construction Permits\IRC - Reuse Automation - UCP 4065\Bid Documents - Reuse <br /> Automation \00800 Supplementary Conditions Reuse Automation . doc <br />