My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any and all items that require correction under this Agreement and that are identified after the preparation <br /> of the Statutory List remain the obligation of the Contractor to complete to the Owner' s satisfaction under <br /> this Agreement . After receipt of the Statutory List by the Contractor , the Contractor acknowledges and <br /> agrees that it will diligently proceed to complete all items on the Statutory List and schedule a final walk- <br /> through in anticipation of final completion on the Project . <br /> SC 14 . 04D Delete paragraph 14 . 04D of the General Conditions in its entirety and replace with the <br /> following : <br /> At the time of delivery of the tentative certificate of Substantial Completion , Engineer will deliver to Owner and <br /> Contractor a written recommendation as to division of responsibilities pending final payment between Owner <br /> and Contractor with respect to security , operation , safety , and protection of the Work , maintenance , HVAC , <br /> utilities , insurance , and warranties and guarantees . <br /> SC14 . 07A . 3 Delete paragraph 14 . 07A . 3 of the General Conditions in its entirety . <br /> SC - 14 . 078 . 1 Delete paragraph 14 . 0713 . 1 of the General Conditions in its entirety and replace with the <br /> following : <br /> 1 . if, on the basis of Engineer' s observation of the Work during construction and final inspection , and <br /> Engineer' s review of the final Application for Payment and accompanying documentation , all as <br /> required by the Contract Documents , Engineer is satisfied that the Work has been completed and <br /> Contractor' s other obligations underthe Contract Documents have been fulfilled , Engineerwill indicate , <br /> within twenty days after receipt of the final Application for Payment , in writing Engineer' s <br /> recommendation of payment and present the Application to Owner for payment . Thereupon Engineer <br /> will give written notice to Owner and Contractor that the Work is acceptable . Otherwise , Engineer will <br /> return the Application for Payment to Contractor, indicating in writing the reasons for refusing to <br /> recommend final payment , in which case Contractor shall make the necessary corrections and <br /> resubmit the Application for Payment . <br /> SC- 14 . 07 . C . 1 Delete paragraph GC - 14 . 07 . C . 1 in its entirety and replace with the following : Payment shall <br /> be made by Owner to Contractor according to the Local Government Prompt Payment Act , Florida <br /> Statutes section 218 . et . seq . <br /> SC 14 . 08 Delete paragraph 14 . 08 of the General Conditions in its entirety . <br /> SC 14 . 09 Delete paragraph 14 . 09 of the General Conditions in its entirety . <br /> ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br /> SC - 15 . 02 . A . 1 Delete subparagraph 15 . 02 . A . 1 of the General Conditions in its entirety , and replace with <br /> the following : <br /> 1 . Contractor' s persistent failure to perform the Work in accordance with the Contract Documents ; <br /> SC - 15 . 02 . A . 4 Delete subparagraph 15 . 02 . A . 4 of the General Conditions in its entirety , and replace with <br /> the following : <br /> 4 . Contractor' s violation of any material provisions of the Contract Documents . <br /> SC 15 . 02 . A . 5 and 6 : Add the following new subparagraphs at the end of paragraph GC - 15 . 02 . A <br /> 5 . Failure of Contractor to make proper payments to Subcontractors for labor, services , materials or <br /> equipment in connection with the Work ; <br /> 00800- 15 <br /> F :\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - Reuse Automation- UCP 4065\Bid Documents - Reuse <br /> Automation \00800 Supplementary Conditions Reuse Automation . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.