My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addenda will be binding . Oral and other interpretations or <br /> clarifications will be without legal effect. <br /> All Bids must be received by the Purchasing Division office located at <br /> 1800 271h Street , Vero Beach , FL 32960 prior to the date and time <br /> shown above . Late Bids will be returned unopened . <br /> Addenda may be issued to clarify , correct , or change the Bidding <br /> Documents as deemed advisable by OWNER or ENGINEER. <br /> Clarifications / Corrections <br /> 1 . The Contractor is responsible for determining the suitability of using <br /> existing equipment and radio devices . The owner will be responsible <br /> for repair/ replacement of existing equipment only if said equipment is <br /> defective in its current use . <br /> 2 . Liclude in bid price FCC annual registration service for 10 years on <br /> additional radio devices installed . <br /> 3 . Insert Attachment 1 in Section 00300- 5 . <br /> 4 . Question : How many Data Flow Syste»rs (DFS) RTUs are currently <br /> Being used in yottr• existing SCADA system ? , . <br /> Answer : There are approximately 305 RTUs with 3 RTUs <br /> Communicating with PLCs . <br /> 5 . Question : Wliat are the I/ O regatirements for each reuse site <br /> Answer : I / Os available on the current reuse RTUs vary . <br /> I / O requirements of the new system is the responsibility of the <br /> bidder . <br /> * * * * * * * * *Thus Addendum. MUST be returned with your Bid* * * * * * * * * <br /> ADDENDUM NO . 1 is subnutted by <br /> L . R. Brown , PE <br /> and <br /> Purchasing <br />
The URL can be used to link to this page
Your browser does not support the video tag.