My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . 08 Receipt and Application of Insurance arid-a-Change Order <br /> Proceeds Coat <br /> A. Any -insured less wader the-PeIiGiGS of 5 . 10 Partial Utilization, Acknowledgment of <br /> lasurar�se <br /> Feqjjired by paF2gfaph 5 . 06 will be adjusted Property Insurer <br /> s <br /> fidYdary fnr the-iRsureds , aG theiF iRte><estS Ma-y A . If OWNER finds it necessary to occupy or use <br /> a portion or portions of the Work prior to Substantial <br /> MGFtgage Glause and of paFagraph 5 . 0843 . OWNER Completion of all the Work as provided in paragraph <br /> eaey-S,,e,, 14 . 05 , no such use or occupancy shall commence <br /> rerce terl_Q_ aand sh�l_misa#tribAt Gh before the insurers providing the property insurance <br /> agreement aS theparties in interest may FeaGh . Il—rf-ne pursuant to paragraph 5 . 06 have acknowledged notice <br /> ether s, edalagreemen+ is reach ^rt the damaged thereof and in writing effected any changes in cover- <br /> t crn crrt ra--rcuvr�cc—cr-ro—czcr <br /> age necessitated thereby. The insurers providing the <br /> property insurance shall consent by endorsement on <br /> appropriate the policy or policies , but the property insurance shall <br /> not be canceled or permitted to lapse on account of <br /> any such partial use or occupancy . <br /> B—OWN €Rs fiducar3 -saall have power +n <br /> raIr <br /> adjUSt and settle n „ <br /> Ince vVith the ins , rers unless GRe <br /> of + he parties in interest shall ehiert in _Fting , ..ithin 15 ARTICLE 6 - CONTRACTOR' S RESPONSIBILITIES <br /> da7s- after the- rer�sc�- ^gess +- o 0;4!Np , <br /> exercise of this-power . If sureesti^ ^ be mad <br /> QWNF= R as fidWGiaFY S11211 make lerne^t with the 6 . 01 Supervision and Superintendence <br /> s the <br /> parties in interest may FlBaGh . If ^ ^ S , Gh agreemerol A. CONTRACTOR shall supervise , inspect , and <br /> among the parties in int^ res + ' s rearherl OWNER a6 direct the Work competently and efficiently, devoting <br /> #+daaci�af4-ad lst .... settle the-gesswit-,.,�h the such attention thereto and applying such skills and <br /> aRsurers and if reg „ irert ig WFi+inn by any part , in expertise as may be necessary to perform the <br /> Work in <br /> in+eyes + (1WN ' F.= R as fr7 'Wrian , Shan give hAAdl fnr the accordance with the Contract Documents . <br /> CON - <br /> TRACTOR shall be solely responsible for the means , <br /> methods , techniques , sequences , and procedures of <br /> 5 . 09 Acceptance of Bonds and Insurance; Option construction , but CONTRACTOR shall not be <br /> to Replace responsible for the negligence of OWNER or <br /> ENGINEER in the design or specification of a specific <br /> means , method , technique , sequence , or procedure of <br /> construction which is shown or indicated in and <br /> +n " <br /> cions of the Bends or irasararase re ^ , firer+ expressly required by the Contract Documents . CON - <br /> TRACTOR shall be responsible to see that the <br /> completed Work complies accurately with the Contract <br /> ^hall Documents . <br /> receipt of the Gertifirates— (er ether . eviQeRGe B . At all times during the progress of the Work , <br /> requested}-required by paragraph 2 . 05 . G . t ^ IE-R CONTRACTOR shall assign a competent resident <br /> superintendent thereto who shall not be replaced <br /> ase without written notice to OWNER and ENGINEER <br /> provided as the-ether may reaSenab 'Y Fequest . if except under extraordinary circumstances . The <br /> superintendent will be CONTRACTOR's <br /> representative at the Site and shall have authority to <br /> act on behalf of CONTRACTOR . All communications <br /> part}-i given to or received from the superintendent shall be <br /> binding on CONTRACTOR . <br /> aniGhaRge iR the required Beverage . Withew <br /> nreii dire to aRy ether right I .er remerl � , the other n -„-+„ 6 . 02 Labor; Working Hours <br /> nrnter+ S „ rh ether narhrs interests at the expense of A . CONTRACTOR shall provide competent , <br /> suitably qualified personnel to survey, lay out, and <br /> construct the Work as required by the Contract Docu - <br /> 00700 - General Conditions REV 04 -07.doc <br /> 00700 - 18 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase It (43rd Ave to 27th Ave)Wdmim\bid documents\00700 - General Conditions REV 04-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.