B . &AINER shall employ @Rd—Pay for - the
<br /> nniirn of an iRdepenrl ont test '
<br /> ,,�,,,,�s- o , g , r , , , a �,�„a�rr�«�+Rgaberate"o B . If ENGINEER considers it necessary or
<br /> perform all iRspeGtiGRS , tests-, -Gr apprevals required b advisable that covered Work be observed by ENGI -
<br /> u oRtS E?, GePr NEER or inspected or tested by others , CONTRAC-
<br /> TOR , at ENGINEER's request , shall uncover, expose ,
<br /> 1 for inSt✓ ortinncr tests , rpr nr nrn„ols or otherwise make available for observation , inspec-
<br /> GAVEIF19d by paragFaphs 1. 2 - 03 - C arid 13 . 03 . 9 p
<br /> tion , or testing as . ENGINEER may require , that
<br /> below-, portion of the Work in question , furnishing all neces -
<br /> sary labor, material , and equipment. If it is found that
<br /> 2 . tth ;; t GesrSr,ro .1such Work is defective , CONTRACTOR shall pay all
<br /> tests OF iRspeGtiGRS. GGRGIIJGted t—to Claims , costs , losses , and damages (including but not
<br /> limited to all fees and charges of engineers , architects ,
<br /> said paragFaph 13 . 04 . 13a, @Rd attorneys , and . other professionals and all court or
<br /> arbitration or other dispute resolution costs ) arising out
<br /> of or relating to such uncovering , exposure , observa -
<br /> tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction (including but not
<br /> C . If Laws or Regulations of any public body limited to all costs of repair or replacement of work
<br /> of
<br /> having jurisdiction require any Work (or part thereof) others ) ; and OWNER shall be entitled to an
<br /> specifically to be inspected , tested , or approved by an appropriate decrease. in the Contract Price . If
<br />the
<br /> employee or other representative of such public body, parties are unable to agree as to the amount thereof,
<br /> CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in
<br /> arranging and obtaining such inspections , tests , or paragraph 10 . 05 . If, however , such Work is not
<br /> found
<br /> approvals , pay all costs in connection therewith , and to be defective , CONTRACTOR shall be allowed an
<br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the
<br /> tion or approval . Contract Times (or Milestones ) , or both , directly
<br /> attributable to such uncovering , exposure ,
<br /> D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement , and
<br /> arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to agree
<br /> as to
<br /> connection with any inspections , tests , or approvals the amount or extent thereof, CONTRACTOR may
<br /> required for OWNER's and ENGINEER's acceptance make a Claim therefor as provided in paragraph
<br /> of materials or equipment to be incorporated in the 10 . 05 .
<br /> Work; or acceptance of materials , mix designs , or
<br /> equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work
<br /> CONTRACTOR' s purchase thereof for incorporation
<br /> in the Work . Such inspections , tests , or approvals A. If the 'Aferk is defeGtiVe , OF GONITRAICT
<br /> shall be performed by organizations acceptable to falls t ' able
<br /> OWNER and ENGINEER .
<br /> E . If any Work (or the work of others ) that is to
<br /> be inspected , tested , or approved is covered by CON - ,
<br /> TRACTOR without written concurrence of ENGI - URtil the Gayse fGF S6113h eFder has boon eliminated ;
<br /> NEER, it must, if requested by ENGINEER, be uncovhewever, this right of OWNER to step the Work shall
<br /> -
<br /> ered for observation . n� pp
<br /> evorn��vicuc� -Q Pr
<br /> F . Uncovering Work as provided in paragraph al
<br /> 13 . 03 . E shall be at CONTRACTOR's expense unless
<br /> CONTRACTOR has given ENGINEER timely notice atRefthem .
<br /> of CONTRACTOR's intention to cover the same and
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice .
<br /> 13 . 04 Uncovering Work
<br /> A. If any Work is covered contrary to the written
<br /> request of ENGINEER , it must , if requested by ENGI -
<br /> NEER , be uncovered for ENGINEER's observation
<br /> and replaced at CONTRACTOR's expense .
<br /> 00700 - General Conditions REV 04 -07. doc
<br /> 00700 - 36