Laserfiche WebLink
payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 . 06 Preconstruction Conference <br /> SC -2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place : <br /> A . Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Construction Coordination Manager will call a preconstruction <br /> conference at a place the ENGINEER designates to establish an understanding <br /> among the parties as to the work and to discuss schedules referred to in <br /> paragraph 2 . 05 . 13 , procedures for handling Shop Drawings and other submittals , <br /> and maintaining required records . Utility companies and others as appropriate will <br /> be requested to attend to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC -3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC -3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A . In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 . General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 . Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC402 Subsurface and Physical Conditions <br /> SC -4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. B: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> Roadway Soil Survey — Oslo Road ( CR 606 ) Phase II Roadway Widening <br /> (43rd Avenue to 27th Avenue ) . <br /> D . Reports and drawings itemized in SC-4 . 02 . 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Administration <br /> Building , Public Works , 1801 27th Street Vero Beach FL 32960 during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents . <br /> SC -5 . 01 Performance , Payment and Other Bonds <br /> SC -5 . 01 . A . Delete paragraph GC- 5. 01 . A in its entirety and insert the following paragraphs in its <br /> place : <br /> Within ten ( 10 ) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100 % of the Contract Price . <br /> 00800-2 <br /> 00800 - Supplementary Conditions 06-09 rev. doc <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11 (43rd Ave to 27th Ave)\Admim\bid documents\00800 - Supplementary Conditions 06-09 rev.doc <br />