My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC - 13 . 03 Test and Inspections <br /> SC- 13 . 03 . 13 . Delete the first sentence of paragraph GC- 13. 03. B in its entirety, and insert the <br /> following sentences in its place : <br /> B . OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections , tests , or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below . Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or approvals <br /> shall be paid for by the CONTRACTOR by back charge to subsequent applications for <br /> payment . The CONTRACTOR shall arrange , obtain , and pay for the following <br /> inspections , tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below ; <br /> 2 . costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04 . 13 ; <br /> 3 . tests otherwise specifically provided in the Contract Documents . <br /> 13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 . A . Delete paragraph GC- 13. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled workers <br /> or suitable materials or equipment , or fails to comply with permit requirements , or <br /> fails to comply with the technical specifications , or fails to perform the Work in such <br /> a way that the completed Work will conform to the Contract Documents , OWNER <br /> may order CONTRACTOR to stop the Work, or any portion thereof, until the cause <br /> for such order has been eliminated ; however, this right of OWNER to stop the Work <br /> shall not give rise to any duty on the part of OWNER to exercise this right for the <br /> benefit of CONTRACTOR , any Subcontractor , any Supplier, any other individual or <br /> entity , or any surety for, or employee or agent of any of them . <br /> 14 . 02 Progress Payments <br /> SC- 14 . 02 . 13 . 5 . Delete paragraph GC- 14. 02. B. 5. d in its entirety and insert the following paragraph in <br /> its place: <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 . 02 . A ; or <br /> SC- 14 . 02 . B . 5 . Add the following sentences at the end of paragraph GC- 14. 02. B. 5: <br /> e . OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work ; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing, inspections , <br /> tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC- 14. 02. C. 1 in its entirety and insert the following paragraph in <br /> its place: <br /> 00800-7 <br /> oo800 - supplementary conditions 06-09 rev.doc <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11 (43rd Ave to 27th Ave)\Admim\bid documents\00800 - Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.