My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 — Submittal of Shop Drawings <br /> N . Any related Work performed or equipment installed without an "Approved " <br /> or "Approved as Corrected " Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR . <br /> O . Submit Shop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved . CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings . Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner . <br /> P . ENGINEER will review and process all submittals promptly , but a <br /> reasonable time should be allowed for this , for the Shop Drawings being <br /> revised and resubmitted , and for time required to return the approved <br /> Shop Drawings to CONTRACTOR . <br /> Q . Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals . All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings , Samples or other items requiring approval , will be back- charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions . If the CONTRACTOR requests a substitution <br /> for a previously approved item , all of ENGINEER ' S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR . <br /> + + END OF SECTION + + <br /> 01340 - Submittal of Shop Drawings . doc <br /> 01340-6 <br /> F:\Pu1blicWorks\ENG1NEERlNG DIVISION PROJECTS\0533-Oslo Rd Phase II (43rd Ave to 27th Ave )\Admim\bid documents\01340 - Submittal of <br /> Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.