Laserfiche WebLink
SECTION NO . 104 EROSION CONTROL AND TREATMENT OF DEWATERING <br /> WATER AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off-site . . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project' s construction . The <br /> OWNER reserves the right to require the CONTRACTOR to employ additional <br /> pollution control measures , when in the sole opinion of the OWNER , they are <br /> warranted . If site specific conditions require additional erosion and stormwater <br /> pollution control measures during any phase of construction or operation to prevent <br /> erosion or to control sediment or other pollution , beyond those specified in the <br /> Drawings or herein , implement additional best management practices as necessary , <br /> in accordance with Chapter 4 , " Best Management Practices for Erosion and <br /> Sedimentation Control " of the Florida Erosion and Sediment Control Inspector' s <br /> Manual , http : //www . dep . state . fl . us/water/ nonpoint/ ero man . htm and other <br /> references as may be required by regulatory permits . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively , the OWNER may halt the CONTRACTOR ' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR ' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering " of the Florida Erosion and Sediment Control Inspector' s Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC - 6 . 08 of the Supplementary Conditions . Per paragraph SC - 6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for , obtain , and pay <br /> for all other required permits , licenses , sampling , and tests . Permits the <br /> Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11 (43rd Ave to 27th AveMdmim\bid <br />