Laserfiche WebLink
SECTION — 120 = EXCAVATION AND EMBANKMENT <br /> A . Earthwork , including earthwork for drives outside the right- of-way limits , shall be paid <br /> for as embankment . Cost shall include all work specified in this section and Section <br /> 120 of the Standard Specifications . Such price and payment shall specifically <br /> include all cost of any roadway , lateral ditch or canal , and final dressing operations . <br /> B . Earthwork quantities shall be considered as in - place material with no shrinkage or <br /> expansion factors . <br /> C . Pond 200 Stormwater Facility <br /> See Section 01009 of the Special Provisions ( G ) for special material placement <br /> requirements . <br /> D . Subsoil Excavation - Any excavation below the proposed bottom elevation of the select <br /> fill , isolated swale bottom locations , isolated locations for pipe installations and as <br /> approved by the engineer shall be paid for as subsoil excavation . Approximately 2 . 0 ft <br /> of subsoil excavation is required in sublateral canals . Cost of replacement embankment <br /> shall be included in cost of subsoil excavation . Contractor to coordinate with county <br /> representative prior to any subsoil excavation . <br /> E . Embankment - General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 120- 7 . 2 : <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is modified by <br /> the addition of the following : <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic <br /> material may be designated as muck or unsuitable for construction of subgrade by the <br /> Owner . <br /> Backfill material containing more than 2 . 0 % by weight of organic material , as determined <br /> by FM 1 -T 267 and by averaging the test results for three randomly selected samples <br /> from each stratum or stockpile of a particular material , shall not be used in construction <br /> of the reinforced volume . If an individual test value of the three samples exceeds 3 . 0 % , <br /> the stratum or stockpile will not be suitable for construction of the reinforced volume . <br /> No A- 8 material permitted in embankment . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 120 - 1 — Excavation , Regular — Per Cubic Yard <br /> Bid Item No . 120 -4 - Excavation , Subsoil - Per Cubic Yard <br /> Bid Item No . 120 -6 — Embankment ( compacted in place ) — Per Cubic Yard <br /> SECTION - 160 = STABILIZATION <br /> The work specified in this item shall conform to Section 160 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction ( 2010 ) . <br /> A . Sub Article 160 - 5 . 1 is modified by the addition of the following : <br /> "The stabilization thickness indicated on plans shall be considered a minimum thickness . <br /> Thickness will vary to conform to the lines , and grades shown in the plans . " Minimum <br /> L . B . R . = 40 - No under-tolerance . <br /> 01025-21 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11 (43rd Ave to 27th Ave )\Admim\bid documents\Technical <br />