Laserfiche WebLink
The determination of the appropriate method (s ) of compliance is the complete and sole <br /> responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br /> ENGINEER for accuracy, completeness or any other purpose . The OWNER and <br /> - -ENGINEER -sball - have -no -responsibility -to -review -or --checkthe BIDDER 's - compliance <br /> with the Trench Safety Standards . <br /> 8 . The BIDDER , in submitting this bid , represents that it has obtained and considered all <br /> available geotechnical information , has utilized said geotechnical information and that, <br /> based on such information and the BIDDER's own information , the BIDDER has <br /> sufficient knowledge of the Project's surface and subsurface site conditions and <br /> characteristics to assure BIDDER's compliance with the applicable Trench Safety <br /> Standards in designing the trench safety system(s ) for the Project. <br /> I <br /> BIDDER : , jar <br /> By: awn �? . <br /> (Ll <br /> Position or Title: <br /> Date : 3 <br /> STATE OF f' I Or i <br /> COUNTY OF z + . <br /> Personally appeared before me , the undersigned authority, AUq T- ML L <br /> who after first being sworn b me , affixed his/her siginature in the space provided above on this <br /> day of , 20 . <br /> ANTOINETTE PETERSON <br /> Mota Public, State a large NOTARY PUBLIC <br /> My Commission Expires : STATE OF FLORIDA <br /> Comm# EE026292 <br /> Expires 9/29/2014 <br /> " * END OF SECTION <br /> 00454 - Florida Trench Safety Act - REV 04-07 .doc <br /> 00454 - 2 <br /> F:xPubfic WorksIENGINEERING DIVISION PROJECTS0533-Osio Rd Phase 11 (43rd Ave to 271h Ave)Wdmim\bid documents\00454 - Florida Trench Safety Act - REV 04- <br /> 07.doc <br />