My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> CLARIFICATIONS / CORRECTIONS : <br /> 1 ) The 6, 500 cubic yards of the excavated material from Pond 200 originally proposed to be placed on the <br /> Indian River Federal Credit Union site and the 10 ,000 cubic yards of the excavated material from Pond <br /> 200 originally proposed to be placed on the Elwill Associates, Inc. site shall be amended to not be <br /> placed on the two above sites. <br /> This material is hereby amended to be included in Line Item 120- 1 , EXCAVATION REGULAR. <br /> 2) IRC Utility services : <br /> a) Any service under pavement shall be placed in larger sized conduit sleeve . Any service extensions <br /> shall be constructed by replacing the entire polyethylene service from the water main to the new <br /> meter location. (No splicing permitted). The cost shall be included in Line Item 1645 - 800 WATER <br /> METER (RELOCATE) <br /> b) Prior to construction all valves shall be located by GPS and properly mapped out. The cost shall be <br /> included in Line Item 108- 1 AS -BUILTS <br /> c) All valves shall be maintained and accessible during construction. <br /> d) As-builts of the utilities shall be completed and approved prior to any testing (pressure , <br /> bacteriological , etc.) . The cost shall be included in Line Item Line Item 108 - 1 AS -BUILTS <br /> e) Pressure and/or bacteriological testing shall be included in all utility stub outs . <br /> f) The cost for the sampling points on the utility lines shall be included in the cost of the pipe. Also <br /> included in this cost and the responsibility of the contractor is the jumper for filling, pressure test, <br /> chlorination, filling, flushing, bacteriological testing, etc. <br /> 3 ) All phases of the Maintenance of Traffic (MOT) plan shall be submitted for review and approval by the <br /> Engineering Division. The MOT does not have to be certified by an engineer. <br /> 4) BRIDGE MODIFICATION — The existing pedestrian pole and signal box located at he northwest <br /> corner of the bridge will be re-located by the county prior to construction. <br /> 5) All planted trees and other plantings shall be guaranteed for 120 days after planting . The contractor <br /> must take due care to assure the plantings survival . <br /> 6) Line Item 630- 1 - 12 CONDUIT (F&l) (UNDERGROUND) (2" PVC) shall include two — two inch (2") <br /> conduits to be placed in the same trench. The price per linear foot includes the two conduits. <br /> 7) At approximately Station 194+50 , a bus turnout is shown on the plans (see Sheet 18 ) . At that location, <br /> south of the proposed 8 foot wide sidewalk a 6 . 5 foot by 15 foot — 8 inch thick concrete pad is shown. <br /> The Bus Shelter shall not be included in the contract. <br /> 8) The contract will not require the contractor to pay rent for the use of the Cumberland Farms building <br /> (site office) . However, utilities will be paid for by the contractor. <br /> 9) The contractor is responsible to remove the existing building as indicated on the plans (Sheet 16) . <br /> There is no asbestos report done for this building. <br /> Page 2 of 3 <br /> R IPubUe WorkslENGINEERING DIVISION PI?OJECTS)0533-Oslo Rd Phase H (43rd Ave to 27th Ave)lAdmimIADDENDUMSt4ddendum ## doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.