My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER any duty or authority to supervise or direct E . Unless stated otherwise in the Contract Docu - <br /> the performance of the Work or any duty or ments , words or phrases which have a well- <br />known <br /> authority to undertake responsibility contrary to the technical or construction industry or trade meaning are <br /> provisions of paragraph 9 . 10 or any other provision used in the Contract Documents in accordance with <br /> of the Contract Documents . such recognized meaning . <br /> B . Day <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> 1 . The word "day' shall constitute a <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight . 2 . 01 Delivery of Bonds <br /> C . Defective A . When CONTRACTOR delivers the executed <br /> Agreements to OWNER, CONTRACTOR shall also <br /> 1 . The word "defective , " when modifying deliver to OWNER such Bonds as CONTRACTOR <br /> the word "Work," refers to Work that is may be required to furnish . <br /> unsatisfactory , faulty, or deficient in that it does <br /> not conform to the Contract Documents or does 2 . 02 Copies of Documents <br /> not meet the requirements of any inspection , <br /> reference standard , test , or approval referred to A. OWNER shall furnish to CONTRACTOR up <br /> in the Contract Documents, or has been to ten copies of the Contract Documents . Additional <br /> damaged prior to ENGINEER's recom - copies will be furnished upon request at the cost of <br /> mendation of final payment (unless responsi- reproduction . <br /> bility for the protection thereof has been <br /> assumed by OWNER at Substantial 2 . 03 Commencement of Contract Times; Notice <br /> Completion in accordance with paragraph to Proceed <br /> 14 . 04 or 14 . 05 ) . <br /> A. The Contract Times will commence to run on <br /> D . Furnish, Install, Perform, Provide the thirtieth day after the Effective Date of the Agree- <br /> ment or, if a Notice to Proceed is given , on the day <br /> 1 . The werd"furnish ," WhGR used in indicated in the Notice to Proceed . A Notice to Pro- <br /> GORnestieA vlith services , materials;Or ceed may be given at any time within 30 days after the <br /> Effective Date of the Agreement . In no event will the <br /> ca4id. cnn ,iGeS materials , nr oni iinm on + +n the Contract Times commence to run later than the <br /> sixtieth day after the day of Bid opening or the thirtieth <br /> e day after the Effective Date of the Agreement, <br /> GE) RditiGR. whichever date is earlier . <br /> 2 . The word "iastall"whea—used—ire 2 . 04 Starting the Work <br /> GIDRReGtien -viith—seWiGes , mateF; als , er <br /> A. CONTRACTOR shall start to perform the <br /> in final POSitiOR Said <br /> sre ; s , G; Work on the date when the Contract Times com - <br /> e Ge plete and rood „ for intended mence to run . No Work shall be done at the Site prior <br /> use to the date on which the Contract Times commence to <br /> run . <br /> 3 . The words"Perferm " er "Prevido" <br /> when used—in GerrnestieR with seruises 2 . 05 Before Starting Construction <br /> materials , shall me2R tO ish <br /> and install said sewiGes , materials , or A. CONTRACTOR 's Review of Contract Docu- <br /> 8E}+ Ij�rnEfl+ GO plete onrl ready for intended ments: Before undertaking each part of the Work <br />, <br /> use. CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent <br /> 4 . When "furnish , " " install , " " perform , " or figures therein and all applicable field measurements . <br /> " provide" is not used in connection with services , CONTRACTOR shall promptly report in writing to <br /> materials , or equipment in a context clearly ENGINEER any conflict , error, ambiguity, or <br /> requiring an obligation of CONTRACTOR, discrepancy which CONTRACTOR may discover and <br /> "provide" is implied . shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected <br /> 00700 - General Conditions REV 04-07 .doc <br /> 00700 - 8 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11 (43rd Ave to 27th Ave )\Admim\bid documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.