specified in the General Requirements) , CONTRAC- CONTRACTOR until acceptable schedules are <br /> TOR shall submit to ENGINEER for its timely review: submitted to ENGINEER . <br /> 16 a preliminary progress schedule 1 . The progress schedule will be <br /> indicating the times (numbers of days or dates) acceptable to ENGINEER if it provides an <br /> for starting and completing the various stages orderly progression of the Work to completion <br /> of the Work, including any Milestones specified within any specified Milestones and the <br /> in the Contract Documents; Contract Times. Such acceptance will not <br /> impose on ENGINEER responsibility for the <br /> 2 * a preliminary schedule of Shop progress schedule, for sequencing , scheduling , <br /> Drawing and Sample submittals which will list or progress of the Work nor interfere with or <br /> each required submittal and the times for sub- relieve CONTRACTOR from CONTRACTOR's <br /> mitting , reviewing, and processing such full responsibility therefor. <br /> submittal; and <br /> 2. CONTRACTOR's schedule of Shop <br /> 30 a preliminary schedule of values for Drawing and Sample submittals will be <br /> all of the Work which includes quantities and acceptable to ENGINEER if it provides a <br /> prices of items which when added together workable arrangement for reviewing and <br /> equal the Contract Price and subdivides the processing the required submittals. <br /> Work into component parts in sufficient detail to <br /> serve as the basis for progress payments 3. CONTRACTOR's schedule of values <br /> during performance of the Work. Such prices will be acceptable to ENGINEER as to form <br /> will include an appropriate amount of overhead and substance if it provides a reasonable <br /> and profit applicable to each item of Work. allocation of the Contract Price to component <br /> parts of the Work. <br /> the Site is started , CONTRACTOR and OetemWelyNE all ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br /> each deliver to the other, with copi o each AMENDING , REUSE <br /> additional insured identified in t upplementary <br /> Conditions, certificates of urance (and other <br /> evidence of insuran ich either of them or any 3 . 01 Intent <br /> additional insur ay reasonably request) which <br /> CONTRA and OWNER respectively are A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> called for by all. <br /> 2006 Preconstruction Conference Be It is the intent of the Contract Documents to <br /> describe a functionally complete Project (or part there- <br /> As Within 29 days aft8F the GeAtraiat Tilvies a&.#. of) to be constructed in accordance with the Contract <br /> to run, but before any Work at the Site i rted , a Documents. Any labor, documentation, services, <br /> conference attended by CONTRAC , ENGINEER, materials, or equipment that may reasonably be <br /> � 04 <br /> and others as appropriate wil held to establish a inferred from the Contract Documents or from <br /> prevailing custom or trade usage as being required to <br /> weeive * to <br /> Work and to disc a schedules referred to in para- produce the intended result will be provided whether <br /> graph 2 . 05 mcedures for handling Shop Drawings or not specifically called for at no additional cost to <br /> and er submittals, processing Applications for OWNER. <br /> In amure ot and Ma <br /> C. Clarifications and interpretations of the <br /> 2 . 07 Initial Acceptance of Schedules Contract Documents shall be issued by ENGINEER <br /> as provided in Article 9. <br /> A. Unless otherwise provided in the Contract <br /> Documents, at least ten days before submission of the 3 . 02 Reference Standards <br /> first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- A. Standards, Specifications, Codes, Laws, and <br /> ate will be held to review for acceptability to ENGI- Regulations <br /> NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . 13. CONTRACTOR 1 . Reference to standards, specifica- <br /> shall have an additional ten days to make corrections tions, manuals, or codes of any technical <br /> and adjustments and to complete and resubmit the society, organization , or association , or to Laws <br /> schedules. No progress payment shall be made to or Regulations, whether such reference be <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTSW545,66Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents\00700 - General Conditions REV 04-07.doc <br />