Laserfiche WebLink
2. 07 as it may be adjusted from time to time as <br /> provided below. b. CONTRACTOR certifies that: (i) <br /> there is no increase in cost to the OWNER; <br /> 1 . CONTRACTOR shall submit to and (ii) it will conform substantially, even <br /> ENGINEER for acceptance (to the extent indi- with deviations, to the detailed requirements <br /> cated in paragraph 2. 07) proposed adjustments of the item named in the Contract <br /> in the progress schedule that will not result in Documents. <br /> changing the Contract Times (or Milestones) . <br /> Such adjustments will conform generally to the 2. Substitute Items <br /> progress schedule then in effect and additional- <br /> ly will comply with any provisions of the General a. If in ENGINEER's sole discretion an <br /> Requirements applicable thereto. item of material or equipment proposed by <br /> CONTRACTOR does not qualify as an <br /> 2. Proposed adjustments in the "or-equal" item under paragraph 6. 05.A. 1 , it <br /> progress schedule that will change the Contract will be considered a proposed substitute <br /> Times (or Milestones) shall be submitted in item . <br /> accordance with the requirements of Article 12 . <br /> Such adjustments may only be made by a b. CONTRACTOR shall submit suffi- <br /> Change Order or Written Amendment in actor- cient information as provided below to allow <br /> dance with Article 12. ENGINEER to determine that the item of <br /> material or equipment proposed is <br /> 6.05 Substitutes and . "Or-Equals" essentially equivalent to that named and an <br /> acceptable substitute therefor. Requests for <br /> A. Whenever an item of material or equipment is review of proposed substitute items of <br /> specified or described in the Contract Documents by material or equipment will not be accepted <br /> using the name of a proprietary item or the name of a by ENGINEER from anyone other than <br /> particular Supplier, the specification or description is CONTRACTOR. <br /> intended to establish the type, function , appearance, <br /> and quality required . Unless the specification or c. The procedure for review by ENGI- <br /> description contains or is followed by words reading NEER will be as set forth in paragraph <br /> that no like, equivalent, or "or�qual" item or no 6. 05.A.2 .d , as supplemented in the General <br /> substitution is permitted , other items of material or Requirements and as ENGINEER may <br /> equipment or material or equipment of other Suppliers decide is appropriate under the <br /> may be submitted to ENGINEER for review under the circumstances. <br /> circumstances described below. <br /> d . CONTRACTOR shall first make <br /> 1 . "Or-Equal" Items: If in ENGINEER's written application to ENGINEER for review <br /> sole discretion an item of material or equipment of a proposed substitute item of material or <br /> proposed by CONTRACTOR is functionally equipment that CONTRACTOR seeks to <br /> equal to that named and sufficiently similar so furnish or use. The application shall certify <br /> that no change in related Work will be required , that the proposed substitute item will <br /> it may be considered by ENGINEER as an perform adequately the functions and <br /> "or-equal" item , in which case review and achieve the results called for by the general <br /> approval of the proposed item may, in design , be similar in substance to that <br /> ENGINEER's sole discretion , be accomplished specified, and be suited to the same use as <br /> without compliance with some or all of the that specified. The application will state the <br /> requirements for approval of proposed substi- extent, if any, to which the use of the pro- <br /> tute items. For the purposes of this paragraph posed substitute item will prejudice <br /> 6. 05.A. 1 , a proposed item of material or CONTRACTOR's achievement of Substan- <br /> equipment will be considered functionally equal tial Completion on time, whether or not use <br /> to an item so named if: of the proposed substitute item in the Work <br /> will require a change in any of the Contract <br /> a. in the exercise of reasonable Documents (or in the provisions of any other <br /> judgment ENGINEER determines that: (i) it direct contract with OWNER for work on the <br /> is at least equal in quality, durability, Project) to adapt the design to the proposed <br /> appearance, strength, and design substitute item and whether or not <br /> characteristics; (ii) it will reliably perform at incorporation or use of the proposed substi- <br /> least equally well the function imposed by tute item in connection with the Work is sub- <br /> the design concept of the completed Project ject to payment of any license fee or royalty. <br /> as a functioning whole, and ; All variations of the proposed substitute <br /> 00700 - General Conditions REV 04=07.doc <br /> 00700 - 19 <br /> FAIDublic WorkMENGINEERING DIVISION PROJECTS10545%66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\00700 - General Conditions REV 04-07.doc <br />