_ . _ .
<br /> 3. Payments made by CONTRACTOR contractor, or anyone directly or indirectly
<br /> to Subcontractors for Work performed by employed by any of them or for whose acts any
<br /> Subcontractors. If required by OWNER, CON- of them may be liable, and royalty payments
<br /> TRACTOR shall obtain competitive bids from and fees for permits and licenses,
<br /> subcontractors acceptable to OWNER and
<br /> CONTRACTOR and shall deliver such bids to f. Losses and damages (and related
<br /> OWNER, who will then determine, with the expenses) caused by damage to the Work, not
<br /> advice of ENGINEER, which bids, if any, will be compensated by insurance or otherwise, sus-
<br /> acceptable. If any subcontract provides that the tained by CONTRACTOR in connection with
<br /> Subcontractor is to be paid on the basis of Cost the performance of the Work (except losses
<br /> of the Work plus a fee, the Subcontractor's and damages within the deductible amounts of
<br /> Cost of the Work and fee shall be determined property insurance established in accordance
<br /> in the same manner as CONTRACTOR's Cost with paragraph 5. 06 . D), provided such losses
<br /> of the Work and fee as provided in this para- and damages have resulted from causes other
<br /> graph 11 . 01 . than the negligence of CONTRACTOR , any
<br /> Subcontractor, or anyone directly or indirectly
<br /> 4. Costs of special consultants employed by any of them or for whose acts any
<br /> (including but not limited to engineers, of them may be liable. Such losses shall
<br /> architects, testing laboratories, surveyors, include settlements made with the written
<br /> attorneys, and accountants) employed for consent and approval of OWNER. No such
<br /> , services specifically related to the Work. losses, damages, and expenses shall be
<br /> included in the Cost of the Work for the
<br /> 5. Supplemental costs including the purpose of determining CONTRACTOR's fee.
<br /> following :
<br /> g . The cost of utilities, fuel, and sanitary
<br /> a. The proportion of necessary trans- facilities at the Site.
<br /> portabon , travel, and subsistence expenses of
<br /> CONTRACTOR's employees incurred in dis- h. Minor expenses such as telegrams,
<br /> charge of duties connected with the Work. long distance telephone calls, telephone service
<br /> at the Site, expressage, and similar petty cash
<br /> b. Cost, including transportation and items in connection with the Work,
<br /> maintenance, of all materials, supplies, equip-
<br /> ment, machinery, appliances, office, and i . When the Cost of the Work is used to
<br /> temporary facilities at the Site, and hand tools determine the value of a Change Order or of a
<br /> not owned by the workers, which are consumed Claim , the cost of premiums for additional
<br /> in the performance of the Work, and cost, less Bonds and insurance required because of the
<br /> market value, of such items used but not con- changes in the Work or caused by the event
<br /> sumed which remain the property of CON= giving rise to the Claim.
<br /> TRACTOR.
<br /> J. When all the Work is performed on the
<br /> c. Rentals of all construction equip- basis of cost-plus, the costs of premiums for all
<br /> ment and machinery, and the parts thereof Bonds and insurance CONTRACTOR is
<br /> whether rented from CONTRACTOR or others required by the Contract Documents to
<br /> in accordance with rental agreements approved purchase and maintain .
<br /> by OWNER with the advice of ENGINEER, and
<br /> the costs of transportation , loading, unloading , Be Costs Excluded. The term Cost of the Work
<br /> assembly, dismantling , and removal thereof. shall not include any of the following items:
<br /> All such costs shall be in accordance with the
<br /> terms of said rental agreements. The rental of 1 . Payroll costs and other compensation
<br /> any such equipment, machinery, or parts shall of CONTRACTOR's officers, executives, princi-
<br /> cease when the use thereof is no longer pals (of partnerships and sole proprietorships) ,
<br /> necessary for the Work. general managers, engineers, architects,
<br /> estimators, attorneys, auditors, accountants,
<br /> d . Sales, consumer, use, and other purchasing and contracting agents, expediters,
<br /> similar taxes related to the Work, and for which timekeepers, clerks, and other personnel
<br /> CONTRACTOR is liable, imposed by Laws and employed by CONTRACTOR, whether at the
<br /> Regulations. Site or in CONTRACTOR's principal or branch
<br /> office for general administration of the Work
<br /> e . Deposits lost for causes other than and not specifically included in the agreed upon
<br /> negligence of CONTRACTOR, any Sub- schedule of job classifications referred to in
<br /> 00700 - General Conditions REV 04-07.doc
<br /> 00700 - 31
<br /> FAPublic Works%ENGINEERING DIVISION PROJECTS10545*66Th Ave SR60 to 57th St (Aresdls)\Admim\Bid Documents\00700 - General Conditions REV 04-07.doc
<br /> f
<br />
|